Council archive · source document
06/823 - SUPERSEDED Negotiated Decision Notice [As Published] · 132006.823
NOOSA COUNCIL IDAS Development Application Decision Notice 37 of 51
Water Supply
253. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
254. The applicant is advised that this development may require the provision of fire hydrants and a booster
pump in accordance with the Building Code of Australia, and consultation may also be needed with
Queensland Fire Services to ensure suitable fire fighting infrastructure is provided. To this end any
necessary fire hydrants shall be clearly shown on the plans submitted for both Plumbing Works and
Building Works approval and if a booster pump is deemed necessary, the plans shall indicate where the
fire truck is to be accommodated in order to provide boosting to the water supply.
255. Water supply to the Resort is to be by connection into existing water mains adjacent to the site.
Other Services
256. The Developer shall provide Electricity, a TV antennae system and Telecom services to the resort. All
electricity and Telecom services shall be provided underground.
257. All electricity and Telecom services are to be contained with the existing road reserve, external to the Site.
The Developer is to provide street lighting on-site.
Traffic – External
Traffic Management Plan
258. The Developer shall submit a Traffic Management Plan prepared by a Registered Professional Engineer
of Queensland specialising in traffic management for approval by the Manager – Land Development with
the lodgement of any application for operational works for the Site.
259. The Traffic Management Plan shall include, but not be limited to, the following:
259.1. construction vehicle management;
259.2. the number of construction vehicle movements per day on Viewland Drive to ensure impacts on
residents are limited;
259.3. car park provisions during construction.
259.4. limited access management during construction hours;
259.5. signage management;
259.6. operational vehicle management; and
259.7. speed limit requirements.
Traffic Management for Morwong Drive and Viewland Drive
260. Access to the Resort is to be via Viewland Drive from 7:00 am to 7:30 pm and from Morwong Drive from
7:00 pm to 7:30 am.
261. Appropriate signage to the reasonable satisfaction of the Manager – Land Development and Manager
Land Use advising guests, visitors, employees and invitees of the Resort of the access arrangements is to
be erected. A sign shall be provided at the Morwong Drive cul-de sac head.
262. Guests of the Resort are to be informed at the time of making a reservation of the access arrangements
on Site.
263. Emergency services, local taxi companies and bus and tour operators are to be informed of the access
arrangements on Site.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d8112a9b\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/823 - SUPERSEDED Negotiated Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 303 KB (small file)
- File type
No other editions are linked here.