Stormwater Management Plan MCU17/0014
The original of this document is very large (11.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 58, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn2.4.2 Major maintenance inspection 2.4.3 Major maintenance: sediment
(once a year) removal and cartridge replacement
(and emergency)
The primary goal of the major maintenance inspection is
to assess the condition of the cartridges relative to the Major maintenance/filter cartridge replacement typically
level of sediment loading. It may be desirable to conduct involves the steps below. However, if it appears that a spill
this inspection during a storm to observe the relative flow of some type has occurred, the local hazard control agency
through the filter cartridges. If the submerged cartridges and Stormwater360 should be notified immediately. In the
are severely plugged, large amounts of sediments should case of a spill, the worker should abort maintenance
be present and very little flow will be discharging from activities until the proper guidance has been obtained.
the drainage pipes. It is likely that the cartridges need to
Depending on the configuration of the particular system, a
be replaced. Major maintenance inspection will typically
worker may be required to enter the vault to perform some
involve the steps below. However, if it appears that a spill of
tasks. If vault entry is required, OH&S rules for general
some type has occurred, the local hazard control agency
confined space entry must be strictly adhered to. Filter
and Stormwater360 should be notified immediately. In the
cartridge replacement should occur during dry weather
case of a spill, the worker should abort maintenance
and it may be necessary to plug the filter inlet pipe if base
activities until the proper guidance has been obtained.
flows exist. Standing water present in the vault should be
Steps for Pre-Major Maintenance Inspection regarded as polluted and contained during this operation by
temporarily capping the manifold connectors.
1 Maintenance to be performed by a skilled worker
familiar with StormFilter units.
2 If applicable, set up safety equipment to protect
Please note: Confined space entry may be
pedestrians from fall hazards presented by open
required on StormFilter systems. In this case,
doors. Also, set up appropriate safety equipment for
please ensure that appropriate Confined Space
work near roadways.
entry training and subsequent certification has
3 Inspect the external condition of the unit and take been undertaken and is valid, and work
notes concerning defects/problems. procedures are strictly adhered to. If you are
unsure, do not enter the vault and contact
4 Open the access covers to the vault and allow the vault to
Stormwater360 immediately.
air out for 5-10 minutes.
5 Without entering the vault, give the inside of the unit,
including components, a general condition inspection.
6 Take notes about the external and internal condition.
7 Give particular attention to recording the level of
sediment build-up on the floor of the vault, and on top
of the internal components.
8 Remove large loose debris and litter using a pole with a
grapple or net on the end.
9 If the visit is during a storm, make the flow observations
discussed above.
10 Close and fasten the access cover, and remove
safety equipment.
11 Make notes about the local drainage area relative to
ongoing construction, erosion problems, or high loading
of other materials to the system.
12 Review the condition reports from the previous
minor and major maintenance visits and schedule for
cartridge replacement if needed.
24 Stormwater360 Operations and maintenance
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.