Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2020-06-15 General Committee Meeting Notes

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING RECOMMENDATIONS                                      15 JUNE 2020

            attract significantly reduced disposal fees at the landfill with some items free.
            Higher gate fees are charged for mixed waste.
            Waste storage areas must provide for adequate separation of all reusable,
            recyclable and waste materials. These must be located so that they are
            convenient and safe to use.
            The Plan must contain the following information:
            a.    The areas for the storage and separation of waste shown on a site plan;
            b.    A waste management table as indicated below is to be completed showing
                  how waste material is to be segregated - recycled – reused or disposed;
                  and
            c.    Table – Waste Management Table
        MATERIALS ON-SITE              DESTINATION
                                       Re-use and Recycling                    Disposal
        Expected waste    Estimated    On-site            Off-site             *specify
        materials         volume(m³)   *specify proposed *specify contractor   contractor and
                                       re-use or on-site and       recycling   landfill site or
                                       recycling methods  outlet               other disposal
                                                                               site
        Excavation
        material
        Green waste
        Bricks
        Concrete
        Timber-please
        specify
        Plasterboard
        Metals - please
        specify
        Asbestos
        Other - please
        specify
       Note * If a demolition contractor is undertaking works, then the Waste Management
       table is to be completed by the demolition contractor.
       Damage to infrastructure
       13 14.    Any damage to footpaths, street plantings, natural vegetation/trees kerb and
            channel, bridges or roadways must be repaired or reinstated to at least pre-
            existing conditions.
       Litter, erosion and sediment control
       14 15.   Litter, erosion and sediment control measures must be installed and
            maintained until soils are stabilised by turf, vegetation or sealed.
            Note: it is an offence under the Environmental Protection Act 1994 to deposit or
            potentially allow litter, waste, soil, or other contaminants to enter a waterway or
            storm water drainage system (e.g. roadside gutter).
       Landscaping Works
       17 16.    The development site must be landscaped. The works must be undertaken
            in accordance with an Operational Works approval and the Noosa Plan for that
Log in to download the original file

2020-06-15 General Committee Meeting Notes(PDF, 780KB).pdf · 799 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.