2020-06-15 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING RECOMMENDATIONS 15 JUNE 2020
attract significantly reduced disposal fees at the landfill with some items free.
Higher gate fees are charged for mixed waste.
Waste storage areas must provide for adequate separation of all reusable,
recyclable and waste materials. These must be located so that they are
convenient and safe to use.
The Plan must contain the following information:
a. The areas for the storage and separation of waste shown on a site plan;
b. A waste management table as indicated below is to be completed showing
how waste material is to be segregated - recycled – reused or disposed;
and
c. Table – Waste Management Table
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume(m³) *specify proposed *specify contractor contractor and
re-use or on-site and recycling landfill site or
recycling methods outlet other disposal
site
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management
table is to be completed by the demolition contractor.
Damage to infrastructure
13 14. Any damage to footpaths, street plantings, natural vegetation/trees kerb and
channel, bridges or roadways must be repaired or reinstated to at least pre-
existing conditions.
Litter, erosion and sediment control
14 15. Litter, erosion and sediment control measures must be installed and
maintained until soils are stabilised by turf, vegetation or sealed.
Note: it is an offence under the Environmental Protection Act 1994 to deposit or
potentially allow litter, waste, soil, or other contaminants to enter a waterway or
storm water drainage system (e.g. roadside gutter).
Landscaping Works
17 16. The development site must be landscaped. The works must be undertaken
in accordance with an Operational Works approval and the Noosa Plan for that