Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2020-06-15 General Committee Meeting Notes

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING RECOMMENDATIONS                                        15 JUNE 2020

       Currency Period
       2 3. The Currency Period for this development approval lapses if the use has not
            happened by 18 June 2026 unless an application to extend the currency period
            is approved by Council.
       Building Height
       3 4. The maximum height of the development must not exceed the maximum height
            as reflected in the approved plans with respect with the finished ground level and
            the natural ground level.
       Access and Parking
       4 5. No parking is allowed on the driveway of the adjacent Noosa River Holiday Park
            site.
       Building Appearance
       5 6. The development must be finished with subdued/muted external building colours,
            as shown on the approval plans.
       6. 7 Roof materials must be non-reflective to minimise the visual impact of the
            development.
       7 8. Any fencing must be designed and be of a colour that blends with the
            environment and complements the building design.
       8 9. Any waste bins or air conditioning units must be suitably screened so they are
            not visible externally to the site.
       Lighting
       9 10. External light sources utilised on site are limited to an external light outside the
             front door of the facility and a single dock light, used for a maximum for 30
             minutes during operation start and finish times outside of daylight hours.
       Stormwater
       10 11.    All stormwater run-off from the new works is to be connected to the existing
            on-site drainage system.
       DEMOLITION
       Works
       11 12.    Any demolition works must be undertaken in a manner that causes no
            detrimental effect upon the amenity of the neighbourhood by reason of the
            creation of excessive noise, lighting, air-borne hazards, atmospheric pollutants
            (including dust or odours) nuisance or any other emissions in accordance with
            the nuisance provisions of the Environmental Protection Act 1994.
       Waste management
       12 13.    A Waste Management Plan (demolition) must be submitted in accordance
            with Planning Scheme Policy 11 - Waste Management Plan and approved by
            Council’s Waste Coordinator prior to issue of a development permit for Building
            Works for demolition, removal or relocation.
             The purpose of the Waste Management Plan is to facilitate the segregation of
             waste for the effective reuse and recycling of such materials. Segregated wastes
Log in to download the original file

2020-06-15 General Committee Meeting Notes(PDF, 780KB).pdf · 799 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.