3.5.2 Gross Pollutant Traps
All field inlet pits are proposed to contain gross pollutant traps/filter bags (EnviroPod
200 or similar) prior to discharging to the stormwater quality device as discussed in
Section 3.5.1.
Refer to product brochures in Appendix B.
Based on the manufacturer’s advice, it has been estimated that the average cleanout
frequency is approximately once annually.
Clear and unobstructed access to the GPT’s will be required in order to regularly
clean and maintain the devices. GPT’s have been located within the proposed
driveway and as such are accessible by vehicles for servicing. The current proposal
shows nominal locations to demonstrate appropriate access for maintenance. Refer
to product brochures in Appendix B for further information on cleaning and
maintenance of the gross pollutant traps.
3.5.3 Calculations
Reference is made to the attached drawing no. 205-002-C13.01 (Appendix D) which
details the development site catchment area requiring treatment by the system, post
development.
The treatment train which incorporates a stormwater detention/filtration system and a
gross pollutant trap was completed using the Model for Urban Stormwater
Improvements Conceptualisation (MUSIC) software to estimate system performance
against the water quality objectives.
The treatment train effectiveness (refer to Figure 3.4 overleaf) shows the total
suspended solids (TSS), total phosphorus (TP) and total nitrogen (TN) load removal
performance for the treatment train which demonstrates achievement of the water
quality targets detailed in Section 2.4 – Water Quality Objectives.
Figure 3.2 provides the layout of the source and treatment nodes used in the water
quality modelling.
Mogpropmanagement Pty Ltd Page 7 205-002-002R
Stormwater Management Plan
Noosaville Site
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.