Appendix I - Stormwater Management Plan
Attached to the e-mail MCU14/0083 Appendices.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Figure 3.2 MUSIC layout summary
The treatment train includes the following stormwater quality measures (refer Figure
3.2):
All flows from the site will be directed to field inlet pits containing gross
pollutant traps/filter bags (EnviroPod 200 or similar);
Flows from all catchments, will discharge to the end of line underground
stormwater detention/filtration system (ZPG Stormfilter or similar) through a
piped network before discharging to the external stormwater system.
Preliminary assessment has indicated that water quality treatment utilising the
filtration devices can be provided in one location on the site (refer to drawing no. 205-
002-C10.01 in Appendix A) with further consideration given to appropriate final
locations to be undertaken at detailed design stage.
Specific aspects of the treatment train are discussed in further detail in the sections
below.
3.5.1 Stormwater Detention with Filtration
Stormwater from all site catchments (refer to drawing no. 205-002-C13.01 in
Appendix A) is proposed to be treated by a Stormwater360 detention system (or
approved equivalent) with a 4 cartridge ZPG Stormfilter system (Stormfilter
requirements determined in accordance with Stormwater360 product information -
refer product information provided by Stormwater 360 in Appendix B).
Maintenance frequency of the system is determined by the pollutant loading and in
this case, the system is expected to require annual maintenance.
Access will need to be provided for the maintenance and cleaning of the stormwater
filters due to their location within the product. Refer to product brochures in Appendix
Mogpropmanagement Pty Ltd Page 6 205-002-002R
Stormwater Management Plan
Noosaville Site
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.