Appendix I - Stormwater Management Plan
Attached to the e-mail MCU14/0083 Appendices.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn stormwater network with the capacity of accommodating 10 year ARI flows. Table
Furthermore, the developed scenario results in an overall reduction in flow width in
comparison to the pre development scenario. Table 4.2 outlines the reduction in
overland flow contributing to Gateway Drive as a result of the development.
Table 4-2 Overland flow contributing to Gateway Drive
Scenario 10 year ARI (l/s) 100 year ARI (l/s)
Pre development 43 74
Post development 0 44
Mogpropmanagement Pty Ltd Page 12 205-002-002R
Stormwater Management Plan
Noosaville Site
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.