Skip to the record
Noosa’s premier civic archive.

Council archive · source document

08/0771 - OP Works - Landscaping [As Published] · 142008.771

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008

 

REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA

4.14. | |s any of the proposed operational work removing, destroying or damaging marine plants under the Fisheres Act 1994?
fie No - Go fo 04.15 Yes

If yes, is the proposed operational work reasonably necessary for. (Tick applicable box/es and answer (a) and/or (b) below)

() The removal, destruction or damage of dead marine wood on unallocated State tand, other than ina ([]No [1] Yes
wild river area, for trade or commerce

(ii) The maintenance of existing structures, including, for example, the following structures, if the (No [Yes
structures were constructed in compliance with all the requirements, under any Act, relating to a
structure of that type —
+ _ boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and
weirs;
« — existing drainage structures;
+ _existing powerlines or associated powerline infrastructure

(iii) For educational or research purposes or for the monitoring the impact of development on marine ‘oO No (1 Yes
plants

(iv) For the construction or placement of structures, including, for example, swimming enclosures, safety [ino (Yes
signs, aids to navigation, fences, pontoons, public boat ramps and pipelines, if -
¢ The extent of the removal, destruction or damage is minor, and
« The structures were constructed in compliance with all the requirements, under any Act, relating —
to a structure of that type

(v) For the construction of runnets for mosquito control, removal of Lyngbya, seed collection for site CINo LClYes
rehabilitation or the collection of marine plants for fishing bait, or handicraft

(a) If yes to one or more of (i) — (v) above, does ail the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
(71 Yes - A permit for that aspect of the operational work is not required. Go to 04.15 CINo- Goto (n)

(b) _{f no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?

Cno- (Compt rom Part 0,) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPIBF is not
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
O Yes

If eB is all of the proposed operational work for specified works under the Wild Rivers Act 2005?

Yes ~ Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it, (Complete Form 1, Part 02) This application requires assessment by the Department of Primary industries and Fisheries
(DPI&F) and, subject fo the declaration for the retevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
DPI&F is not the Assessment Menager for the appication, the agency has jurisdiction as Concurrence Agency.

 

CNo

if no, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or

infrastructure required to support other development for which a development permit is not required or, ifa

development permit is required, the permit is held or has been applied for?

Oo Yes - Uniess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Farm 1, Part 02) This appiication requires assessment by the Department of Primary industies and Fisheries
(DPI&F} and, subject fo the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
DPIBF is not the Assessment Manager for the anpication, the agency has jurisdiction as Concurrence Agency.

| No - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.

MMA schedute @ part! tebie 4 tue 8 IPA scredule ® part? toble 4 tem 4: Fishenes Peg. ation 1995 $1134 set-assnss.ime coder) Keguiahon schedule # table 2 iteni 25 (P
Reguiztion scheduie 1, part 2 tate 4, tem & Fisnenes Act 1994, seczon 7608 (wio river areal, W.id Kivers Act 200 secoon 434 iéicver! wid wer declaration Wild Rivers Code

 

 

 

 

Page 31

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0771 - OP Works - Landscaping [As Published].pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.