Council archive · source document
08/0771 - OP Works - Landscaping [As Published] · 142008.771
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkfist, Version 21.2, 31 March 2008
WILD RIVER AREA
4.15
Is any of the operational work proposed to be carried out in a wild river area deciared under the Wild River Act 2005?
BKINo-Gotoas16 (Yes
If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable?
(i) Agricultural activities as defined under the Wild Rivers Act 2005 (No C1 Yes
{ii) Animat husbandry activities as defined under the Wild Rivers Act 2005 CINo C1 Yes
If yes to either (i) or (ii) above, is any part of the premises in the wild river high preservation area?
Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
CINo
If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
oO Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
Oo No - Unless the appication is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it (Complete Form 1, Part Q if agricutture. Complete Form 1, Part R if animal husbandry} Subject to the declaration for the
relevant wild river area, this application requires assessment by the Department of Natural Resources and Water (NRW). If NRWis not
the Assessment Manager for the appiication, the agency has jurisdiction as Concurrence Agency.
IPA, schedu'e & part) mbra dt
STATE-CONTROLLED ROAD
4.16
1h 1P Ragutahon, schedue 2 tale 2 tem 37 Wud Rivers Act 2005 sectors 42 434
ts any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
PRI No- End ofsaction4 [_] Yes
if yes, is the proposed operational work associated with any of the following? (Tick applicable box/es)
(i) A material change of use that is assessable under the planning scheme
Ono [Yes
(ii) Reconfiguring a lot that increases the total number of lots, or increases the total number offots []No [_] Yes
abutting the State-controlled road
If no to either or both (i) or (ii) above, and answers to questions in this section of the checklist indicate the proposed
operational work is assessable under IPA, schedule 8 - Answer (a) - {c) below.
{a) Is any of the proposed operational work associated with access to a State-controlled road?
ma) Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(b) Is any of the proposed operational work for filling or excavation?
(No Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(1 Yes - his epptication must be referred fo the DMR as Advice Agency.
(c) Does any of the proposed operational work invotve the redirection or intensification of site stormwater from the land,
on @ pipe “yy cross-sectional area greater than 625cm? that directs stormwater to a State-controfled road?
No Yes
ff yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
oO Yes - This application must be referred fo the DMR as Advice Agency.
IP eagu‘aon Sched 2 ¢ tubie fast
Page 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0771 - OP Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.