Council archive · source document
2022021498S0_30-32 James Street_SoAS_Approval · MCU21/0027.02
A&C - Statement of Alternative Solutions
Accreditation and Certification
ABN: 89 791 717 472
Purpose:
In accordance with section 3.3.16 of the Unitywater Accreditation and Certification Manual, any deviation from
the Unitywater Connections Policy, the SEQ Code or the Unitywater Accreditation and Certification Manual (A&C
Manual) will need to be documented and alternative solutions must be proposed by a Major Connections
Certifier.
A Statement of Alternative Solutions ‘SoAS’ for any deviation from standards must be sufficiently detailed to
ensure the Unitywater Auditor is able to fully understand the ‘deviation’ and the proposed ‘alternative solution’.
Further, the SoAS Communicates the ‘justification’ for an alternative solution to the deviation from the relevant
standard to successfully meet requirements of the Prudency and Efficiency test (See Appendix F of the
Unitywater Accreditation and Certification Manual).
Non-conforming Alternative Solutions to SEQ Code standards must be proposed by a Major Connection Certifier
only.
Application Details
SoAS Date: 18/09/2023
Registered Certifier: Brad Downes ACR/MAJ 2018-008
Certifier Category: Major Connections Certifier
Street Address: 30 James Street, Noosaville
Estate Name: (Where Applicable) N/A
Stage Number: (Where Applicable) N/A
Item 1: Proposed Non-conforming Acceptable Solution
What is the proposed non-conforming item?
Clearance between existing 100mm diameter water main and proposed stormwater pipe.
Where is the non-conforming item located?
Frontage of the development site.
Which standard is the non-conforming item attributed to?
Water Supply Code V1.3-2019, section 5.12.5.2 Clearance Requirements
Why can’t the relevant Connections Policy, SEQ Code standard(s), or A&C Manual requirement
be achieved?
The construction works require an amendment to the stormwater design requiring stormwater to cross
at different location (approximately 8m north) than that originally nominated on the design drawings.
The clearance from the existing water main to the newly proposed stormwater pipe will not meet the
requirements of the SEQ Code. It is worthwhile noting there is currently a stormwater pipe in the same
location that also doesn’t meet the requirements of the SEQ Code.
Reasons for accepting a non-standard solution:
• The requirement to shut off a large section of the existing water main servicing existing
dwellings to achieve an additional 100mm separation from the proposed stormwater pipe
crossing. This area is relatively high density and therefore likely to impact a number of users.
Page 1 of 2
Document No: F10719 Revision No: 4 Last Review Date: 21/09/2022 Next Review Date: 21/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
• The existing pipe is reinforced concrete (RCP) and the newly proposed pipe is polypropylene
(PP) which is lighter and therefore ultimately resulting in reduced loading of the existing water
main.
• The proposed solution provides additional clearance to the existing water main from what is
currently provided.
• The water table is quite high in this area and therefore the construction associated with lowering
the main will pose difficulties. There are also a number of services within the existing verge
profile adding to the difficulties associated with lowering the existing water main.
What is the Alternative Solution proposed for the non-conforming item?
Leave the existing water main in its current location.
How does the Alternative Solution satisfy the Prudency and Efficiency test?
This solution satisfies the prudency and efficiency test as relocating the water main will likely result in
the shutoff of water to a relatively large number of dwellings. The proposal is an improvement from
the current situation.
Registered Certifier supporting comments: As the area is sand based, construction of the
stormwater pipe will involve hydro-compaction (water jetting) to ensure mechanical vibration above the
existing water main is not undertaken.
List of supporting Attachments (where applicable):
Drawing 31026C1.1 Revision D
Page 2 of 2
Document No: F10719 Revision No: 4 Last Review Date: 21/09/2022 Next Review Date: 21/09/2024
Page 3
SP156216
3 6
4 RP78252
RP78252
89°59'15"
71.545
WM 6
GTP671
H Pool 4 Office Building
STREET
Single Storey 985m²
Unit Building
Deck GTP671
179°59'15"
27.534
BM: Nail in Kerb
JAMES
RL: 1.34
3 Emt A
RP142979
985m²
359°59'15"
27.534
Single Storey
Unit Building
Building Carports
WM
71.545
SP174678
269°59'15"
4
GTP103989
1 2 3
GTP103989 GTP103989 GTP103989
CP
GTP103989
Issue:
B
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
1.73
1.
Title:
Project
Date: Drawn Design
C
Checked: Drg No. Rev.
R
Used in these records
2022021498S0_30-32 James Street_SoAS_Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 891 KB (small file)
- File type
No other editions are linked here.