Council archive · source document
2022021498S0_30-32 James Street_SoAS_Approval · MCU21/0027.02
• The existing pipe is reinforced concrete (RCP) and the newly proposed pipe is polypropylene
(PP) which is lighter and therefore ultimately resulting in reduced loading of the existing water
main.
• The proposed solution provides additional clearance to the existing water main from what is
currently provided.
• The water table is quite high in this area and therefore the construction associated with lowering
the main will pose difficulties. There are also a number of services within the existing verge
profile adding to the difficulties associated with lowering the existing water main.
What is the Alternative Solution proposed for the non-conforming item?
Leave the existing water main in its current location.
How does the Alternative Solution satisfy the Prudency and Efficiency test?
This solution satisfies the prudency and efficiency test as relocating the water main will likely result in
the shutoff of water to a relatively large number of dwellings. The proposal is an improvement from
the current situation.
Registered Certifier supporting comments: As the area is sand based, construction of the
stormwater pipe will involve hydro-compaction (water jetting) to ensure mechanical vibration above the
existing water main is not undertaken.
List of supporting Attachments (where applicable):
Drawing 31026C1.1 Revision D
Page 2 of 2
Document No: F10719 Revision No: 4 Last Review Date: 21/09/2022 Next Review Date: 21/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2022021498S0_30-32 James Street_SoAS_Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 891 KB (small file)
- File type
No other editions are linked here.