Original source · versioned page text
Appendix G Water and Sewer Analysis
WATER SUPPLY AND SEWER NETWORK ANALYSIS Client: Noosa Shire Council Location: 62 Lake Macdonald Drive, Cooroy Table 9 – Emergency Storage Results Ratio of Total Total available storage storage SPS I.D storage to required available required (m3) (m3) storage CRY020 46 69 1.5 3.4.5 Gravity Sewer Performance All sewer mains between the development connection point and pump station CRY020 maintained a maximum allowable depth of 75% x pipe diameter (i.e. 75% maximum depth ratio) during PWWF, with the exception of pipe 2558134 which had a depth ratio of 76% during the 2036 pre- development scenario. The depth ratio of this pipe increased slightly to 86% in the 2036 post- development case however surcharging was not identified in any of the manholes within this area. Therefore, the proposed development is considered to have a non-worsening effect on the existing gravity sewer performance. Further, for all development scenarios the development internal gravity sewer maintained an acceptable flow depth. Therefore, the development is considered to have a non-worsening effect on the surrounding sewer network. 4.0 CONCLUSION The water supply analysis identified one water connection point off Dianella Ct. It is proposed to extend the existing water main, as described earlier in this report, through the development to serve the proposed development which includes a subdivision for the purpose of residential housing. The analysis demonstrated that, within the DMA, several existing nodes fell below the minimum required pressure of 22m head during a peak hour simulation. However, in the post-development scenarios no additional nodes fell below the minimum required pressure. It was demonstrated that during a fire flow event in the pre-development scenarios that several existing nodes had a residual pressure below 12m head. However, in the post-development scenarios no additional nodes fell below 12m head and the proposed development had a negligible effect on any other existing nodes. In summary, the results from the water analysis demonstrated that the proposed development will have a non-worsening effect on the surrounding network up to and including the design horizon (2036). Further, the proposed extension to the water network provides adequate flow and pressure to the proposed development both during peak hour and under fire flow conditions. The sewer network analysis analysed the network between the development connection points to the existing sewer pump station CRY020 which ultimately discharges to STP-CRY001 via a rising main. The initial assessment of the existing sewer network identified that the pumps in CRY020 had adequate capacity for all pre-development scenarios and the 2021 post-development scenario. For the 2036 post-development scenario, with the development loading, a pump upgrade was required. Through further analysis it was determined that the pump station capacity needed to increase to 18 L/s. It is recommended that the pump station capacity be upgraded before 2031 based on Unitywater’s current demand forecast. With the proposed pump upgrade detailed in this Covey Associates Pty Ltd 8 Project No: 233467 Consulting Engineers M23-0030Rpt Iss A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.