Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Appendix G Water and Sewer Analysis

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                       WATER SUPPLY AND SEWER NETWORK ANALYSIS
Client: Noosa Shire Council                        Location: 62 Lake Macdonald Drive, Cooroy

report, the downstream network demonstrated acceptable performance between the development
connection point and pump station CRY020. Further, using gravity sewer mains the performance
of the network within the proposed development was also acceptable.

Therefore, as demonstrated in the report, with the inclusion of the proposed pump station upgrade
at CRY020 the development will not have a detrimental impact on current and future Unitywater
customers.


5.0 REFERENCES
SEQ Water Supply and Sewerage Design & Construction Code – SEQ WS&S D&C Code SEQ
(2020) Design Criteria

Unitywater (2019) Netserv Plan Appendix B – Schedule of Works




Covey Associates Pty Ltd                   9                                   Project No: 233467
Consulting Engineers                                                           M23-0030Rpt Iss A
Log in to download the original file

Appendix G Water and Sewer Analysis.pdf · 7.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.