Appendix G Water and Sewer Analysis
WATER SUPPLY AND SEWER NETWORK ANALYSIS Client: Noosa Shire Council Location: 62 Lake Macdonald Drive, Cooroy 2.2 Serviceability Requirements 2.2.1 Service Pressure The services pressure requirements that were adopted in accordance with SEQ WS&S D&C Code (2020) included: • Minimum 22m residual pressure during peak hour demand; and, • Maximum 55m service pressure. 2.2.2 Fire Flow The fire flow requirements adopted in accordance with SEQ WS&S D&C Code (2020) are as follows: • 15 L/s for 2 hours with a 2/3 peak hour (PH) background demand for residential; • 30 L/s for 4 hours with a 2/3 peak hour (PH) background demand for commercial/ industrial; • 12m minimum pressure at flowing hydrant; and, • 6m minimum pressure elsewhere in the system. 2.3 Scenarios The scenarios that were used in the assessment of the water supply network were based on the Unitywater InfoWater model supplied and are listed in Table 2. The 2036 scenarios represent the ultimate 20-year design horizon as Unitywater did not provide a 2041 scenario. The full development loading was added to both the 2021 and 2036 post-development scenarios. Table 2 – Water Modelling Scenarios Scenario Model Alias Year Development Stage 2021 Pre-development 2021_Committed_Network_2021PD 2021 Post-development 2021_CN_2021PD_Covey 2036 Pre-development 2036_Committed_Network_2036PD 2036 Post-development 2036_CN_2036PD_Covey 2.4 Peak Hour The service pressure results for the critical nodes during peak hour are shown in Table 3 and in Appendix B. The table demonstrates the lowest pressure results for the most critical node in the development and the most critical node in the existing network during peak hour (5:30pm). UW1686 is in the highest location in the development. NOON122 demonstrated the lowest pressure in the existing DMA and is located along Kensington Dr. The results demonstrated that in all pre-development scenarios there are 31 nodes that did not meet the minimum residual pressure of 22m. These nodes are shown in Appendix B. Further, in the post-development scenarios, no additional nodes fell below the minimum residual pressure. Therefore, the proposed development has a non-worsening effect on the peak hour pressure. It is recommended that Unitywater review the existing failing nodes. In all modelled scenarios within Covey Associates Pty Ltd 3 Project No: 233467 Consulting Engineers M23-0030Rpt Iss A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.