Original source · versioned page text
Appendix G Water and Sewer Analysis
WATER SUPPLY AND SEWER NETWORK ANALYSIS Client: Noosa Shire Council Location: 62 Lake Macdonald Drive, Cooroy Table 6 – Sewer Modelling Scenarios Scenario Model Alias Year Development Stage 2021 Pre-development 2021_PWWF 2021 Post-development 2021_PWWF_COVEY 2031 Pre-development 2031_PWWF 2031 Post-development 2031_PWWF_COVEY 2036 Pre-development 2036_PWWF 2036 Post-development 2036_PWWF_ COVEY 3.4 Network Assessment There are two proposed connection points for the development to existing maintenance structures one in the north and the other in the south on Dianella Ct as shown in the site plans in Appendix A. The connection point drains to the existing sewer pump station CRY020. CRY020 ultimately discharges to the Cooroy Sewage Treatment Plant. The proposed development will use DN150 gravity sewers to convey flow to the connection points. As part of this analysis, the development and associated demand was added to the model based on the site plans shown in Appendix A. The results from the sewer network assessment are shown in Appendix C. In the model provided it was identified that SPS-CRY020 utilised an outdated pump curve for the 2021 and 2036 scenarios. Upon further discussions with Callaghan & Toth it was determined that Unitywater recently upgraded this pump station with two new pumps (Flygt NP3153 SH3-274) with a duty flow of approximately 16 L/s. Refer to Appendix C for pump information. In the 2021 pre-development scenarios the Flygt NP3153 SH3-274 pump model had adequate capacity to cater for the incoming PWWF flow of 14 L/s. In the 2021 post-development scenario, the new Flygt pumps had adequate capacity for the incoming flow of 16 L/s due to the increase in PWWF from the proposed development. In the 2036 pre-development scenario, the pumps had adequate capacity for the incoming PWWF of 15 L/s. In the 2036 post-development scenario, the PWWF further increased to 17 L/s due to the inflow of the proposed development. Due to the increased inflow a pump upgrade was required which increased the duty flow to 18 L/s. Further modelling confirmed that with the full development loading, the pump upgrade would be required before 2031 based on Unitywater’s current demand forecast. However, in the 2031 post-development scenario the existing pumps at CRY020 had adequate capacity up to a sewer loading from the development of 100 EP (assumed to equate to the yield from lot 1 and 2 – 51 units). Note that the pump upgrades and new selected pumps detailed in this report are indicative only and will need to be determined at detailed design as part of a network works application. Covey Associates Pty Ltd 6 Project No: 233467 Consulting Engineers M23-0030Rpt Iss A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.