Original source · versioned page text
Appendix G Water and Sewer Analysis
WATER SUPPLY AND SEWER NETWORK ANALYSIS Client: Noosa Shire Council Location: 62 Lake Macdonald Drive, Cooroy 3.0 SEWER NETWORK ANALYSIS 3.1 Loading The following values were adopted based on SEQ WS&S D&C Code – Design Criteria (2020) to calculate the sewer design loading: • Average dry weather flow, ADWF = 200 L/EP/day* • Peak wet weather flow, PWWF= 5 x ADWF* *Assuming RIGSS sewer will be adopted for construction. The EP for sewer loading is 186 EP. Table 5 shows the development sewer loading based on the total EP. Table 5 – Development Sewer Loading Sewer Loading Parameter L/EP/day L/s ADWF 200 0.43 PWWF 1000 2.15 3.2 Serviceability Requirements All modelled scenarios were compared to the requirements from the SEQ WS&S D&C Code – Design Criteria (2020) and design assumptions which included (but are not limited to): • Emergency storage of 6 hours at average dry weather flow (ADWF) for new pump stations and 4 hours at ADWF for existing pump stations • Maximum depth of flow for gravity sewer of 75% of pipe diameter • Maximum rising main velocity of 3.0m/s (1-2 m/s preferred) • Duty flow of pump stations to be greater than or equal to PWWF 3.3 Scenarios The scenarios that were used in the assessment of the sewer network were based on the Unitywater InfoSWMM model suppled and are listed in Table 6. The 2036 scenarios represent the design horizon as a 2041 scenario was not provided in the model from Unitywater. The full development was added to all post-development scenarios. Covey Associates Pty Ltd 5 Project No: 233467 Consulting Engineers M23-0030Rpt Iss A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.