                      Car Parking
                      A minimum of 4 car parking spaces must be provided and marked on the site and generally
                      in accordance with SCG Consulting Engineer’s Operational Works Driveway & Access Plan
                      (00469-OW4.1) dated March 25 and must include in particular:
                      a.      dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities
                      Pedestrian Facilities
               27.    Construct a 1.5 metre wide footpath within the road verge for the entire length of the site’s
                      frontage to George Street.
                      Condition 26 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Stormwater Drainage
               28.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken generally in accordance with SCG Consulting
                      Engineer’s Operational Works Stormwater Management Plan (00469-SW1.1) dated March
                      25 and must include in particular:
                      a.      3,000L of on-site rainwater retention per dwelling.
                      Condition 27 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Services
               29.    Underground reticulated electricity and telecommunication services must be provided to
                      each lot/unit in accordance the standards and requirements of the relevant service provider.
               30.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               31.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Earthworks and Retaining Walls
               32.    All earthworks and associated batters/retaining structures, both above and below ground
                      level, both temporary and permanent, must be undertaken in accordance with the conditions
                      of this approval, be generally in accordance with SCG Consulting Engineer’s Operational
                      Works Earthworks Plan (00469-OW3.1) dated March 25, and contained entirely within the
                      subject site unless written permission from the respective landowner(s) is provided to
                      Council.
               33.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               34.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.

                                                                                                     Page 14 of 25

Document Set ID: 24104255
Version: 15, Version Date: 15/10/2025

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU25 0057, OPW25 0078 & RAL25 0010 (As Published).pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.