Delegated Report - Code - Planning MCU25 0057, OPW25 0078 & RAL25 0010 (As Published) · MCU25/0057
Car Parking
A minimum of 4 car parking spaces must be provided and marked on the site and generally
in accordance with SCG Consulting Engineer’s Operational Works Driveway & Access Plan
(00469-OW4.1) dated March 25 and must include in particular:
a. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities
Pedestrian Facilities
27. Construct a 1.5 metre wide footpath within the road verge for the entire length of the site’s
frontage to George Street.
Condition 26 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Stormwater Drainage
28. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with SCG Consulting
Engineer’s Operational Works Stormwater Management Plan (00469-SW1.1) dated March
25 and must include in particular:
a. 3,000L of on-site rainwater retention per dwelling.
Condition 27 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Services
29. Underground reticulated electricity and telecommunication services must be provided to
each lot/unit in accordance the standards and requirements of the relevant service provider.
30. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
31. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Earthworks and Retaining Walls
32. All earthworks and associated batters/retaining structures, both above and below ground
level, both temporary and permanent, must be undertaken in accordance with the conditions
of this approval, be generally in accordance with SCG Consulting Engineer’s Operational
Works Earthworks Plan (00469-OW3.1) dated March 25, and contained entirely within the
subject site unless written permission from the respective landowner(s) is provided to
Council.
33. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
34. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Page 14 of 25
Document Set ID: 24104255
Version: 15, Version Date: 15/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU25 0057, OPW25 0078 & RAL25 0010 (As Published).pdfRelated documentApplication case desk ↗
Delegated Report - Code - Planning MCU25 0057, OPW25 0078 & RAL25 0010 (As Published).pdfRelated documentApplication case desk ↗
Delegated Report - Code - Planning MCU25 0057, OPW25 0078 & RAL25 0010 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.