Delegated Report - Code - Planning MCU25 0057, OPW25 0078 & RAL25 0010 (As Published) · MCU25/0057

of 25

Text shows just the words. Original shows the document exactly as it was published.

                      Community Management Statement
               19.    Any proposed Community Management Statement required for the development pursuant to
                      the Body Corporate and Community Management Act 1997 must be submitted to Council for
                      endorsement at the same time as submission of the Building Format Plan (or similar) to
                      Council for compliance assessment.
               20.    All clauses and by-laws of the proposed Community Management Statement must accord
                      with the requirements of this Decision Notice and, in particular, must include the following
                      additional clauses:
                      a.      The site includes a stormwater management and water quality treatment system.
                      b.      The stormwater management and water quality treatment system must be maintained
                              in accordance with the Water by Design (2009) Maintaining Vegetated Stormwater
                              Assets (Version 1).
                      c.      The full cost of maintaining the system in accordance with the Water by Design (2009)
                              Maintaining Vegetated Stormwater Assets (Version 1) must be included in the
                              proposed levies for each dwelling owner/body corporate.
                      Waste Storage
               21.    The refuse areas must be of muted environmental tones to reduce the visual impact of the
                      infrastructure in the streetscape and suitably screened by landscaping where viewed from
                      the street.
               22.    The developer must provide waste storage and disposal facilities in accordance with
                      Planning Scheme Policy 9, Waste Management, including an external imperviously paved
                      area correctly sized for all refuse and recycling containers and suitably screened from public
                      places and neighbouring properties. A bin wash area is required with a cold-water tap, hose
                      and drain outlet connected to sewer, via a bucket trap. The drain outlet must be designed to
                      prevent storm water entry to the sewerage system.
               23.    Refuse containers must be provided in accordance with the requirements of the
                      Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
                      Regulation 2000, for the storage and collection of refuse.
                      Landscaping Works
               24.    The development site must be landscaped. The works must be undertaken in accordance
                      with the PSP2 - Landscape and the Noosa Plan 2020 for that specific area and must include
                      in particular:
                      a.      the works shown on the Approved Plans
                      b.      vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage
               25.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
                      Site Access and Driveways
               26.    A sealed access driveway must be provided from George Street to all parking and
                      manoeuvring areas of the development. The works must be undertaken generally in
                      accordance with SCG Consulting Engineer’s Operational Works Driveway & Access Plan
                      (00469-OW4.1) and Operational Works Driveway Details Plan (00469-OW4.2) dated March
                      25 and must include in particular:
                      a.      a driveway crossover in accordance with Council’s standard drawings RS-049, RS-050
                              and any associated addendum.



                                                                                                      Page 13 of 25

Document Set ID: 24104255
Version: 15, Version Date: 15/10/2025

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU25 0057, OPW25 0078 & RAL25 0010 (As Published).pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.