Original source · versioned page text
RFI - Att 3 - Engineers Response Letter
ingeniir
safe by providing a safe sight distance analysis on the intersection. The analysis must be
prepared by a suitably qualified person (RPEQ – Registered Professional Engineer of
Queensland).
In response to Item 18, sight distances are shown on the Amended Engineering Plans in accordance
with the IPWEAQ Publication Queensland Street, with consideration to operating speeds with
adjacent corner radii.
Issue – Vehicle Manoeuvring
The submitted plans do not include sufficient detail on the access driveway, the
manoeuvring area and access into each proposed garage.
Information Required
19. Provide additional detail on the access driveway and the manoeuvring area. The detail
must be prepared by a suitably qualified person (RPEQ – Registered Professional Engineer
of Queensland) and include, but not be limited to:
a. a design generally in accordance with RS-049, RS-050 and any associated addendum;
b. a longitudinal section extending from the centreline of the formation in Coral Tree
Avenue to driveway adjacent to the garages; and
c. demonstrate that a B99 vehicle will not bottom out of scrape while entering/exiting the
driveway.
20. Provide a Turning Path Plan that demonstrates how the driveway and manoeuvring area
will function. The plan must be prepared by a suitably qualified person (RPEQ – Registered
Professional Engineer of Queensland) and include, but not be limited to:Page 5 of 6
a. demonstrate how a B99 vehicle, beginning and ending at the proposed ‘refuse area’, can
enter and exit each garage while the proposed visitor carpark is occupied; and
b. demonstrate how a B99 vehicle can enter and exit the visitor carpark while both garages
are occupied.
21. Provide comment from a suitably qualified person discussing what necessary safety
controls are to be implemented to ensure the sight lines from the road frontage to the
manoeuvring area remain unobstructed and to remove the potential creation of traffic
hazards between vehicles entering and exiting the site simultaneously.
Refer to the Amended Engineering Plans in response to Items 19 and 20 which demonstrate vehicle
manoeurvring diagrams in the garage apron areas. It is noted that the apron width provided for the
development exceed the requirements of AS2890.1 figure 5.4.
In relation to Item 21, the access driveway is located along the northern boundary of the site. It is a
straight driveway with no curves, structures or landscaping to hinder visibility. As a result sight lines
are unobstructed to ensure no traffic hazards with respect to vehicles entering and exiting the site
simultaneously.
Ingeniir Pty Ltd | 221304-RFI-01
ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
Page 2 | 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original