               20.    A pathway contribution of $68.00 towards external major pathways, in accordance with
                      Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the
                      Council prior to obtaining a Development Permit for Operational Works. This amount will be
                      subject to variations in the Price Index, All Groups Brisbane from June 2004 until the date of
                      payment.
               Stormwater Drainage
               21     The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be generally in accordance with RECOR’s Stormwater
                      Management Plan (20220116-SWMP01) dated 27 September 2022
               Sewer Mains
               22.    The site shall be connected to Council’s existing sewerage reticulation systems and be
                      constructed in accordance with Council’s standards and requirements at no cost to Council.
               Town Water Supply
               23.    The site shall be connected to Council’s existing town water supply and be constructed in
                      accordance with Council’s standards and requirements at no cost to Council.
               Service Easements
               24.    A registered easement shall be created over the existing sewer main that crosses the site.
                      The easements shall generally be parallel to and centred over the sewer main and be
                      equivalent in width to twice the depth to invert level of the sewer at the deepest point within
                      the allotment (measured from the finished surface) and be no less than 3.0 metres wide.
                      In this regard, plans submitted for Operational Works approval shall accurately show the
                      location of the easement.
                      In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
                      undertaking in writing that the Title Deed and the easement documents will be lodged at the
                      Land Titles Office and any additional Titles Office forms or requisitions requiring the consent
                      of Council will be attended to promptly.
                      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
                      use commencing.
                      Any changes required by Council’s Solicitor must be corrected immediately.
               25.    No building or other structure shall be constructed or encroach over an easement. Any
                      building or structure within proximity of an easement or any other public utility’s underground
                      must have its foundations designed so that no surcharge loads are imposed upon such
                      underground infrastructure. Foundations must be taken down a minimum of 1 metre below
                      a line of influence measured 1 metre in the direction of the foundation from the centreline of
                      the closest underground service and along the natural angle of repose of the foundation soil
                      type(s).
                      Plans, and supportive documents, detailing these proposed foundations shall be designed
                      by a registered practicing Geotechnical Engineer and submitted with the application for a
                      Development Permit for Operational Works.
               Headworks
               26.    Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
                      and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
                      Contributions respectively and at the rates applicable at the time of payment. An estimate
                      only of the contribution rates as of June 2004 under the current policies is as follows:

                        Water Supply     $1,097

                        Sewerage         $1,271


                                                                                                     Page 16 of 22

Document Set ID: 22435870
                   22409127
Version: 1,
         10,Version
             VersionDate:
                     Date:23/05/2023
                           18/05/2023
Log in to download the original file

Delegated Report - Code - Planning 132004 4029 01 [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.