Delegated Report - Code - Planning 132004 4029 01 [As Published]
20. A pathway contribution of $68.00 towards external major pathways, in accordance with
Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the
Council prior to obtaining a Development Permit for Operational Works. This amount will be
subject to variations in the Price Index, All Groups Brisbane from June 2004 until the date of
payment.
Stormwater Drainage
21 The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be generally in accordance with RECOR’s Stormwater
Management Plan (20220116-SWMP01) dated 27 September 2022
Sewer Mains
22. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
23. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
Service Easements
24. A registered easement shall be created over the existing sewer main that crosses the site.
The easements shall generally be parallel to and centred over the sewer main and be
equivalent in width to twice the depth to invert level of the sewer at the deepest point within
the allotment (measured from the finished surface) and be no less than 3.0 metres wide.
In this regard, plans submitted for Operational Works approval shall accurately show the
location of the easement.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent
of Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
25. No building or other structure shall be constructed or encroach over an easement. Any
building or structure within proximity of an easement or any other public utility’s underground
must have its foundations designed so that no surcharge loads are imposed upon such
underground infrastructure. Foundations must be taken down a minimum of 1 metre below
a line of influence measured 1 metre in the direction of the foundation from the centreline of
the closest underground service and along the natural angle of repose of the foundation soil
type(s).
Plans, and supportive documents, detailing these proposed foundations shall be designed
by a registered practicing Geotechnical Engineer and submitted with the application for a
Development Permit for Operational Works.
Headworks
26. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates as of June 2004 under the current policies is as follows:
Water Supply $1,097
Sewerage $1,271
Page 16 of 22
Document Set ID: 22435870
22409127
Version: 1,
10,Version
VersionDate:
Date:23/05/2023
18/05/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.