Delegated Report - Code - Planning 132004 4029 01 [As Published]
36.2. Submission of written certification from a suitably qualified person confirming that the
noise levels comply when measured at the nearest residential boundary. This is
required immediately after installation of the equipment and prior to any occupation of
the building, and in a format approved by Council.
36.3. A person must not use equipment on any day if it makes or causes noise to be made
–
36.3.1. Before 7am or after 10pm: More than the lower of either –
• 40 d(B)A
• 3 d(B)A above the background noise level
36.3.2. From 7am to 7pm: More than the lower of either –
• 50 d(B)A
• 5 d(B)A above the background noise level
36.3.3. From 7pm to 10pm: More than 3 d(B)A above the background noise level.
Additional Conditions – 15 May 2023
Site Access and Driveways
37. A sealed access driveway must be provided from Avocet Parade to all parking and
manoeuvring areas of Unit 2 (Lot 6 on 2SP215946). The works must be undertaken in
accordance with an Operational Works approval and must be generally in accordance with
the proposed driveway design included as part of RECOR’s Proposed Residential
Development drawing set (20220116) dated 27 September 2022.
Geotechnical Stability
38. All works must be carried out in accordance with a Geotechnical Report (or part thereof)
prepared by a qualified person* and endorsed through an Operational Works approval.
Earthworks and Retaining Walls
39. All fill and associated batters must be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council. All earthworks must be
undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on
Earthworks for Commercial and Residential Developments.
40. Where the development involves excavation or filling over, or adjacent to, drainage, water
supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
provide a freeboard of 100mm above the finished ground surface level.
41. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
42. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Page 18 of 22
Document Set ID: 22435870
22409127
Version: 1,
10,Version
VersionDate:
Date:23/05/2023
18/05/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.