Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Decision Notice - Minor Change - Council Meeting Decision - 132001 210127 3 [As Published]

of 13

Page text shows just the words. Original shows the document exactly as it was published.

               4.     ASSESSMENT MANAGER CONDITIONS

                      Land Development
               1.     Deleted.
               2.     Deleted.
               3.     Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining
                      properties to the reasonable satisfaction of the Manager of Land Development. Details of the
                      stormwater drainage scheme shall be submitted in conjunction with a Development Permit
                      for Operational Works.
               4.     Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
                      and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
                      Contributions respectively and at the rates applicable at the time of payment. An estimate
                      only of the contribution rates under the current policies is outlined below. These amounts
                      will adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from
                      September 2005 until the date of payment.
                      Stage 3 – March 2001

                        Water Supply     $38,712

                        Sewerage         $19,561

                        TOTAL            $58,273

                      Stage 4 – September 2005

                        Water Supply     $63,237

                        Sewerage         $32,577

                        TOTAL            $95,814

                      All headworks contributions must be paid prior to the issue of a Development Permit for
                      Operational Works.
                      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
                      headworks contributions not be paid at the due time, Council shall call upon the trading bank
                      guarantee in full.
                      In the event that the Development Permit for Material Change of Use of Premises lapses or
                      is cancelled, the contribution or trading bank guarantee will be returned.
               5.     Deleted.
               6.     The new building extensions shall be connected to Council's existing water supply and
                      sewerage reticulation systems in accordance with Council’s standards and requirements and
                      at no cost to Council.
               7.     To protect the environment against siltation/sediment export or soil erosion as a result of the
                      proposed building extensions, an erosion and sediment control plan shall be submitted in
                      conjunction with any Development Permit for Building Works. Site control measures such
                      as silt fencing, controlled gravel access to the site and controlled disposal of waste, may be
                      necessary. Prior to commencement of Building Works:-
                      7.1. all physical site control measures shall be installed and the plan adhered to, and
                      7.2. a $2,000 site control bond shall be lodged with Council to ensure compliance with this
                           condition.




                                                                                                       Page 2 of 13
Document Set ID: 22515524
Version: 7, Version Date: 27/07/2023
Log in to download the original file

Decision Notice - Minor Change - Council Meeting Decision - 132001 210127 3 [As Published].pdf · 195 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.