Original source · versioned page text
Decision Notice - Minor Change - Council Meeting Decision - 132001 210127 3 [As Published]
4. ASSESSMENT MANAGER CONDITIONS
Land Development
1. Deleted.
2. Deleted.
3. Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining
properties to the reasonable satisfaction of the Manager of Land Development. Details of the
stormwater drainage scheme shall be submitted in conjunction with a Development Permit
for Operational Works.
4. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates under the current policies is outlined below. These amounts
will adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from
September 2005 until the date of payment.
Stage 3 – March 2001
Water Supply $38,712
Sewerage $19,561
TOTAL $58,273
Stage 4 – September 2005
Water Supply $63,237
Sewerage $32,577
TOTAL $95,814
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
5. Deleted.
6. The new building extensions shall be connected to Council's existing water supply and
sewerage reticulation systems in accordance with Council’s standards and requirements and
at no cost to Council.
7. To protect the environment against siltation/sediment export or soil erosion as a result of the
proposed building extensions, an erosion and sediment control plan shall be submitted in
conjunction with any Development Permit for Building Works. Site control measures such
as silt fencing, controlled gravel access to the site and controlled disposal of waste, may be
necessary. Prior to commencement of Building Works:-
7.1. all physical site control measures shall be installed and the plan adhered to, and
7.2. a $2,000 site control bond shall be lodged with Council to ensure compliance with this
condition.
Page 2 of 13
Document Set ID: 22515524
Version: 7, Version Date: 27/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original