Decision Notice - Minor Change - Council Meeting Decision - 132001 210127 3 [As Published]
The $2,000 bond will be refunded less any costs incurred by Council in ensuring compliance
with this condition or any additional inspections incurred for substandard work or works
undertaken not in accordance with this permit.
Building
8. The plans submitted for a Development Permit for building works are to comply with the
approved plans
9. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
9.1. On a Sunday or public holiday, at any time; or
9.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
10. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their
responsibilities under the Disabled Discrimination Act (DDA) in regard to the installation of
disabled access and the provision of disabled facilities, and that access to this building and
the provision of sanitary facilities may need to comply with the requirements of Section D
Part D3 and Section F Clause F2.4 of the Building Code of Australia.
11. An identification survey of the subject site is to be carried out by a Licensed Surveyor and is
to be submitted to Council at the time of foundation inspection or immediately thereafter.
Such survey shall set out the boundaries of the site and the position of the buildings on the
site.
12. The developer must provide a suitably screened imperviously paved area large enough for
all refuse and recycling containers. A wash down area is required with a cold-water tap,
hose and drain outlet connected to sewer. The drain outlet is to be designed to prevent
stormwater entry to the sewerage system.
13. Air conditioning units shall be located in a manner which prevents noise nuisance beyond
the subject land in accordance with the nuisance provisions of the Environmental Protection
Regulation 1998. On the spot fines apply for such offences.
14. All food preparation is to be conducted within the existing approved commercial kitchen.
Land Use
15. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are numbered SK-06, 07 issue B SK-8
& 9 Issue A dated 26/01/2000, SD1 (titled ‘Site Plan’), SD2, SD3, dated July 2005, SD4 dated
May 2005 and DA-1 dated September 2005, unless otherwise superseded by Condition 46
of this approval.
16. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to
be completed prior to the premises being occupied and maintained at all times thereafter.
17. Existing trees on the site and within road reserves are to be retained, except where required
to be removed due to building operations or the conduct of the approved use.
18. Any advertising sign or device is to comply with the provisions of Council's policies on
advertising.
19. This Development Permit for a material change of use of premises lapses if the use has not
happened by 7 December 2009, unless an application to extend the currency is approved by
Council.
20. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for building works.
Page 3 of 13
Document Set ID: 22515524
Version: 7, Version Date: 27/07/2023