               Pathway Contributions
               33.    A pathway contribution of $5,343 towards external major pathways, in accordance with
                      Planning Scheme Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the
                      Council prior to obtaining a Development Permit for Operational Works. This amount will be
                      subject to variations in the Consumer Price Index, All Groups Brisbane from September
                      2005 until the date of payment.
               Stormwater Drainage
               34.    All stormwater drainage shall be collected on site and discharged so there is no net increase
                      in stormwater runoff from the site.
               35.    Roof runoff from any new buildings shall be directed to a rainwater storage system or tank
                      (minimum storage capacity equivalent to 20 litres/m2 of new roof area or greater) that is
                      plumbed to service the toilets in the new building and landscaping areas. The design of the
                      rainwater storage system shall be to the satisfaction of the Manager Plumbing Services.
               36.    To ensure that polluted run-off does not enter Council’s stormwater drainage system or
                      nearby creeks, stormwater run-off from the carparking areas and the driveways shall have
                      the first flush (the first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor
                      provided on site prior to being permitted to discharge from the site.
                      All other clean stormwater, such as roof water, can bypass the grease/oil arrestor.
                      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
                      arrestors, which shall be submitted to the Council for approval prior to obtaining a
                      Development Permit for Operational Works.
                      The approved maintenance plan shall be incorporated in the Management Plan for the
                      development and a copy of this shall be provided for Council’s records prior to
                      commencement of the approved Use.
                      A Development Permit for Building Works shall not be granted until a Development Permit
                      for Operational Works has been issued in regard to the drainage scheme.
               37.    All site stormwater drainage shall be by means of a gravity system.
               Sewer Mains
               38.    The existing sewer main that traverses the site and the ‘zone of influence’ (taken as the area
                      within a 45-degree angle measured from the invert of the sewer main to the finished surface
                      level) shall be accurately located and determined by a licensed Surveyor and shown on all
                      plans submitted for Operational Works approval.
                      To ensure Council’s sewer main is accessible for maintenance purposes and is protected
                      from risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
                      retaining walls, raised terraces, etc) shall be constructed within this ‘zone of influence’ and
                      as such the applicant shall amend Operational Works plans including Building plans to
                      ensure compliance.
               Town Water Supply
               39.    The new building and extensions shall be connected to Council’s existing town water supply
                      and be constructed in accordance with Council’s standards and requirements at no cost to
                      Council.
               Earthworks
               40.    Any filling works required on site shall be carried out in accordance with Section 3.8 of
                      Council’s Engineering Design Standards Manual and so as not to cause the additional
                      ponding of water on any adjoining lands or the blockage of, or interference with, any natural
                      watercourses.




                                                                                                       Page 5 of 13
Document Set ID: 22515524
Version: 7, Version Date: 27/07/2023
Log in to download the original file

Decision Notice - Minor Change - Council Meeting Decision - 132001 210127 3 [As Published].pdf · 195 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.