c. The extent of frontage works proposed is as follows;
Stage 1: Lot 1 including frontage works to end of lot 2/3
boundary (refer to 1707-1E).
Stage 2: Lot 2/3 (refer to 1707-1E).
Stage 3: Lot 4 frontage.
The proposed 5.5m road width between lot 2/3 entry and just north of
existing twin 1200mm diameter culverts in Church Street is considered
adequate because;
It will save existing trees and gully at crossing. Widening culverts
and road at this point would require extensive clearing and
reduce amenity/appearance of existing area.
Limiting parking at this location is preferred as Church street
flooding occurs often according to BSM (overtopped ARI 10
existing/developed normal rainfall, overtopped ARI 5
existing/developed climate change rainfall) and Q100 depth is
approximately 0.28m to 0.33m (climate change). Also due to
flooding there will not be dwellings in that location and won’t
need parking.
Existing water main passes close to culverts at present and
widening may require expensive alterations.
Existing road width is same as proposed, and with trees this
creates a low speed environment which is desirable to maintain
for safety.
We hope that this information will allow for approval in the near future, please call with any
queries.
Yours faithfully,
A Haynes BE Civil (Hons) MIE Aust RPEQ CPEng
CC Mark Jones
J:\HCE files 19-12-17\APROJECTS\1707 MJ 4 lots Pomona\CORROUT\RAL 17 0511.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.