Original source · versioned page text
NBN Planning Report_Cooran
Attached to the e-mail MCU15/0034 Development Application - Cover letter, Forms, Proposal plans & Planning Reports.
will be triggered (refer to Section 6.2.1 of this report). Please refer to Drawing C2 of the Proposal Plans in Appendix 1 for further details. 5.1.5 Construction and Noise Noise and vibration emissions associated with the proposed facility are expected to be limited to the construction phase outlined above. Noise generated during the construction phase is anticipated to be of short duration and accord with the standards outlined in the relevant EPA guidelines. Construction works are planned only to occur between the hours of 7.00am and 6.00pm. NBN-4BBZ-4GYM-5132-Schreibers Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.