NBN Planning Report_Cooran
Attached to the e-mail MCU15/0034 Development Application - Cover letter, Forms, Proposal plans & Planning Reports.
3 SITE SELECTION Planning for a new fixed wireless broadband facility is a complex process. NBN Co conducts a rigorous multi-stage scoping process, as outlined below. 3.1 Identification of areas requiring Fixed Wireless coverage NBN Co’s Fixed Wireless locations are determined by a number of factors including the availability of both the NBN Co Fibre transit network and the availability of Point of Interconnect (POI) facilities to allow for the installation of NBN Co fibre equipment. NBN Co uses a number of methods to identify those parts of Australia that require Fixed Wireless coverage. When an area is identified as requiring Fixed Wireless coverage, investigations are undertaken to determine the measures required to provide this coverage. NBN Co has identified a requirement to provide a Fixed Wireless facility at Cooran. The facility is designed to provide Fixed Wireless internet services to dwellings in the rural outskirts of Cooran and the surrounding area, in addition to serving as a key communications link for other NBN Fixed Wireless facilities in the Noosa Council region. 3.2 Site Selection Parameters NBN Co generally identifies an area where the requirement for a Fixed Wireless facility would be highest, a ‘search area.’ A preliminary investigation of the area is then generally undertaken, in conjunction with planning and property consultants, radiofrequency engineers and designers in order to identify possible locations to establish a facility. Generally speaking, new sites must be located within, or immediately adjacent to, the identified search area in order to be technically feasible. However, while the operational and geographical aspects of deploying new facilities are primary factors, there are also many other issues that influence network design, which have to be resolved in parallel. Some of the issues that may be considered include visual amenity, potential co-location opportunities, the availability and suitability of land as well as a willing site provider, occupational health and safety, construction issues (including structural and loading feasibility and access for maintenance purposes), topographical constraints affecting network line of site, legislative policy constraints, environmental impacts, and cost implications. The number, type and height of facilities required to complete the Fixed Wireless network are largely determined by the above operational, geographical and other factors discussed that influence final network design. These compounding factors often severely restrict the available search area within which a facility can be established to provide Fixed Wireless internet services to a local community. NBN-4BBZ-4GYM-5132-Schreibers Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.