Log in to see the plans as drawn 5 Management actions
5 Management actions
The majority of management actions highlighted below are part of existing programs and projects and through the very active community volunteer
work. However, to enhance current programs and activities further funding by Council is proposed, subject to budget deliberations.
The majority of management actions highlighted below are part of existing programs and projects and through the very active community
volunteer
These work.
actions areHowever,
in additiontotoenhance
those already programs
currentoutlined and activities
in other Noosa Council
furtherdocuments, Council
funding by such is proposed,
as the subject
Noosa Plan Noosa toCouncil deliberations.
budget 2013, Noosa
Local Government Area Pest Management Plan 2015-2019 (Noosa Council 2015a), Noosa Local Disaster Management Plan 2015-16 (Noosa
Council
These 2015b) are in
actions and addition
Noosa to those
Bushland already
Reserve outlined
Fire Management Noosa
in otherPlan Council
2015 documents,
(Noosa such as the Noosa Plan Noosa Council 2013, Noosa
Council 2015c).
Local Government Area Pest Management Plan 2015-2019 (Noosa Council 2015a), Noosa Local Disaster Management Plan 2015-16 (Noosa
Relevant objective
Noosa Bushland Reserve Fire Management Plan 2015 (Noosa Council
Council 2015b) and Action 2015c).
Responsibility Timing Required resources
Note: Subject to Council’s shire wide
priorities and budget deliberations
Relevant objective Action Responsibility Timing Required resources
1. Review/upgrade/install
Review/upgrade/install signssigns
withinwithin the park’s
the park’s recreational
recreational areas areas
and along NoosaNoosa Council's
Council's
and along
pathways pathways
including including
the following the following
(ensure all signs(ensure
align with signs align
allNoosa’s Parks and
Environmental
5 Management actionsDesign Noosa’s Design
withPrinciples; Principles;
Noosa Council Noosa Council 2015d):
2015d): Services Areas
Naturalteam (in
consultation
team In with
1.1 Complete a review of current signage within the park and
1. Complete a review of current signage within the park and either Parks and Natural
consultation 2017/2018 Council
Year 1 (subject to Council officer
officer time
time (and TBC
(and
either remove or upgrade all signs as required as per Asset Areas, local
remove or upgrade all signs as required. with Heritage budget deliberations) TBC
for for
anyanysignage
signageupgrades)
The majority of management Management
actionsPlan.
highlighted below are part of existing programs residents, and
Heritage very active community
projects and through the upgrades)
Park Bushland
volunteer work. However, to enhance current programs and activities further Park
funding Bushland
by Council Care
is Year
proposed,1 subject to Council
budget officer time (and TBC
deliberations.
1.2 Investigate the need for new internal trail and/or interpretative Care Group and
Investigate
2. signs the need for new internal trail and/or interpretative Group and 2016/2017 Council new signs)
for anyofficer time (and
and/or notice board. Traditional Owner
signs and/or notice board. Traditional Owner TBC for any new signs)
These actions are in addition to those already in other Noosa groups
Council documents,
groups where
where Noosa
such as theYear Plan Noosa Cost of entrance
Council 2013, interpretive
Noosa
1.3 Develop and install new outlined
interpretative signs at main access 1
relevant)
relevant) signs $3000
Local Government Area points
3. Pest
DevelopManagement
(asand Figure
perinstall new4) that
Plan 2015-2019
interpretative map
includes asigns (Noosa the park
atofmain showing
Council
access 2015a), Noosa Local Disaster
points 2017/2018Management
(subject to New Plan 2015-16
initiative ($200(Noosa
per
infrastructure,
(as per Figure dog
4) off
that leash
includes area
a etc.
map along
of the with
park
Council 2015b) and Noosa Bushland Reserve Fire Management Plan 2015 (Noosa Council 2015c). regulatory
showing budget deliberations) sign)
information and
infrastructure, dogtheoffnatural/cultural/recreational values that is
leash area etc. along with regulatory
consistent
informationwith
andthis
the plan.
natural/cultural/recreational values that is
Relevant objective Action consistent with this plan. Responsibility Timing Required resources
2. Ecological restoration within the park’s bushland reserve areas (i.e.
Review/upgrade/install
Ecological restoration within within
signsthe park’s park’s recreational
thebushland reserve areas areas and along Noosa Council's
(i.e.
excluding
pathways
excluding the
the park’s
including
park’s the
recreational
following
recreational
areas)
(ensure
areas)
including
all signs
including align
the
the
withfollowing:
following: Noosa’s Environmental Part of Council’s Bushland
Design
2.1 Principles;
Continue to Noosa
supportCouncil
the Heritage
2015d): Park Bushland Care Group’s Services team (in Reserve Management
Continue to support
1. environmental Heritage Bushland Care Group’s Noosa Council’s
consultation with
Council’s Ongoing
Ongoing (as(as
perper
the Part current
worksthe
which enhanceParkthe park’s bushland areas. Noosa andofBushland
Council’s Care Group
1. environmental
Complete a reviewworksofwhich enhance
current signagethe park’s
within thebushland
park andareas. Parks
Parks
either Parks andand
and Natural
Natural the maintenance
2017/2018
maintenance (subject to
schedule Council
pest officer time (and
management
program
complete scheduled regeneration works as per Natural Areas schedule in
Noosa Parklands Park Management Plan
2.2 Cremove
ontinueortoupgrade all signs as required. Areas,
Areas local
team in Appendix
budget 8)
deliberations) program
TBC for and in kind (i.e.
any signage
2. Continue to complete scheduled regeneration works as per the
the
NoosaNoosa Local
Local Government
Government AreaArea
PestPest Management
Management Plan Plan
2015- team
residents, Heritage Appendix 8) Bushland
upgrades)Care Group)
2015-2019 and Heritage Park Network BOA (this should be Park Bushland Care Environment grants funding
2019 and Heritage Park Network BOA (this should be updated
2. updated once
Investigate thethe ecological
need for new restoration
internal trailplan
and/oris completed
interpretativeand Group and 2016/2017 Council officer time (and
implemented
signs and/or – see action
notice board. below). Traditional Owner TBC for any new signs)
Noosa Council | Page 25
groups where
Final draft Noosa Parklands 3. Management
ParkDevelop Plan relevant)
and install new interpretative signs at main access points 2017/2018 (subject to New initiative ($200
pageper| 25
(as per Figure 4) that includes a map of the park showing budget deliberations) sign)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.