2016-09-06 P&E Committee - Attachment 1 to Item 6 - Noosa Parklands Park Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Relevant objective Action Responsibility Timing Required resources
2.3 D
efine a whole of site ecological restoration plan that aligns with Noosa Council’s Year 1 Council officer time
Noosa Local Government Area Pest Management Plan 2015- Environmental or cost of consultancy
2019 (Noosa Council 2015) and updates the existing Heritage Services and $5000
Park BOA to: Parks and
Natural Areas in
o clearly prioritise actions (i.e. based on priority zones then
consultation with
priority species including declared and environmental pest
Heritage Park
Page 26 | Noosa Council
plants)
Bushland Care
o divide the
5 Management site into sub-zones which can be managed in a
actions Group)
systematic and structured way
o outline control methods and techniques for each priority pest
plant species
The majority of management actionsthat are appropriate
highlighted below the site
for are part(e.g.
of ensuring
existing programs and projects and through the very active community
the waterbodies are not impacted by inappropriate spraying)
volunteer work. However, to enhance current programs and activities further funding by Council is proposed, subject to budget deliberations.
5 Management actions
o include a landscape design plan for plant species consistent
natural vegetation
Noosa Parklands Park Management Plan
These actions are in addition
with to those alreadyforoutlined
the sitein other Noosa Council documents, such as the Noosa Plan Noosa Council 2013, Noosa
The Government
Localmajority Area incorporate
o Pest
of management training
Management
actions (e.g.
Plan
highlighted relevant
for2015-2019
below community
are(Noosa
part of groups)
Council
existing2015a), Noosa
programs andLocal Disaster
projects Management
and through the very 2015-16
Planactive (Noosa
community
Council 2015b)
volunteer work. and Noosa
However, toBushland
o writeenhance current
the plan Reserve
for programs
the target Management
Fireaudience and Plan
activities
working 2015
further
in that fundingCouncil
zone (Noosa 2015c).
by Council is proposed, subject to budget deliberations.
(e.g. Heritage
5 Management actions Park Bushland Care group working in particular
These actions zones).
addition to those already outlined in other Noosa Council documents, such as the 2013, Noosa
Relevant objective
are inAction Responsibility Timing
Noosa Plan NoosaRequired
Councilresources
Local Government3. Area Pest Management
Engage qualified
Plan 2015-2019
assist
(Noosa Council
Heritage Bushland
2015a), Noosa
Council’s
Local Disaster Management Part
Planof2015-16
Council’s
(Noosa
current
The majority of management actionscontractor
Review/upgrade/install highlighted
signs within
to the below
park’s are partPark
the recreational of existing
areas programs
and along Noosa and projectsOngoing
NoosaCouncil's and through the very active community
Noosa
Council 2015b) andpathways Bushland
Care group with Reserve
sensitive Fire
pest Management
plant control
(ensure all signs Plan
techniques 2015
within
with Noosa’s (Noosa
the Council
Parks and 2015c).
Environmental operational program
volunteer work. However, toincluding
enhance the current
followingprograms and align
activities further funding by Council is proposed, subject to budget deliberations.
park’s
Design bushland
Principles; areas.
Noosa Erosion
Council and sediment control training with
2015d): Services
Natural team
Areas(in
Management
5Relevant Council
objective Action induction programs
actions for staff, contractor and volunteers. team
consultation
Responsibilitywith Timing Required resources
These actions are in addition to those
1. Complete already
a review outlined
of current signage in other
within theNoosa Council
park and either documents, such as the
Parks and Natural 2017/2018 Plan Noosa
Noosa (subject Council
to Council 2013,
officer time Noosa
(and
Local Government4.
Area remove
Investigate or
Pest Managementupgrade all
to enhancesigns as
the required.
road crossings
2015-2019 (Noosa and/or retrofit
Council Areas,
2015a),Noosa local
NoosaCouncil’s budget
Local Disaster deliberations)
OngoingManagement ThisTBC for
Planwill any signage
occur during
2015-16 (Noosa
Review/upgrade/install
optionssigns within
Planthe park’s recreational areas and along Noosa Council's
underpasses improve wildlife to surrounding residents,
EnvironmentHeritage upgrades)
the implementation
The majority
Council 2015b)of andpathways
management
Noosa including
Bushland tothe
actions following
highlighted
Reserve (ensure
Firefauna all movement
below signs
Management arealignpartwith
PlanofNoosa’s
existing
2015 (Noosa Environmental
programs
Council and projects
2015c). and through the very active community
Park Bushland Care
areas
Design Principles;
includingNoosathe Tewantin National Park NP (e.g. during the
Council 2015d): Services section
Services team (in of Council’s Koala
volunteer work. However, 2. to enhance
Investigate thecurrent
need forprograms
new internaland trail activities further funding
and/or interpretative Group
by and
Council is proposed,
2016/2017subject to budget
Council deliberations.
officer time (and
Cooroy-Noosa Road upgrade). Traditional with
consultationOwner Conservation Policy
Relevant objective Action signs and/or notice board.
1. Complete a review of current signage within the park and either Parks and Natural
Responsibility Timing
2017/2018 (subject to TBC for
Required
Council new
anyresources
officer timesigns)
(and
groups where
These actions are in addition to those
remove or upgradealready outlined
all signs in other Noosa Council documents,
as required. Areas, localsuch as the
relevant) Noosa
budget deliberations)
Plan NoosaTBCCouncil
for any2013,
signageNoosa
5. R
3.eport any plants
Develop and install
Review/upgrade/install withinnew
signs within park
the suspected
theinterpretative
park’s signs
recreationalbeing
of at main infected
access
areas and points
along residents,
Noosa Council,
Heritage
NoosaCouncil's 2017/2018 New of Council’s
Partinitiative
Ongoing (subject to upgrades) ($200current
per
Local Government Area Pest
(as
disease
Management
per
(i.e.Figure
myrtle 4)rust) Plan
includes
that to 2015-2019
Biosecurity map of the (Noosa
Queensland park Council
showing
and send
2015a),
Park
Noosa
Bushland
Heritage
Local Disaster Managementsign)
ParkCare budget deliberations)
Plan 2015-16 (Noosa
pest management
pathways including the following (ensurea all signs align with Noosa’s Environmental
Noosa
Council 2015b) andDesign infrastructure,
sealedBushland
samples
2. Principles;
Investigate Noosafor
the dog
Reserve leash
Council
needofffor Fire
identification. area
Management
2015d):
new internal along
etc. trail and/or regulatory
withPlan 2015 (Noosa
interpretative Group
Servicesand
Council
Bushland 2015c).
teamCare
(in 2016/2017 program
Council officer Bushland
and time (and
information and the
signs and/or notice board. natural/cultural/recreational values that is Traditional
group,
consultation Owner
localwith Care Program
TBC for any new signs)
consistent with this plan. groups
Parks where
and
residents Natural
Relevant objective Action1. Complete a review of current signage within the park and either Responsibility 2017/2018
Timing (subject to Council
Required officer time (and
resources
upgrade signs as required. relevant)
Areas, local budget deliberations) for any signage
3. remove
Developor and install all
new interpretative signs at main access points 2017/2018 (subject to TBC
New initiative ($200 per
Ecological restoration
(as per Figure within
4) that park’s bushland
theincludes map of reserve
park areas
showing(i.e. residents, Heritage budget deliberations) upgrades)
sign)
6. R
eview control
Review/upgrade/install methods
signs to reduce
within athe
the park’s extent theand
recreational spread Noosa Council’s
NoosaCouncil's Ongoing Investigate a range of
excluding the park’s recreational
infrastructure, dog off areas)
leash areaincluding
etc. along following:
thewith areasofand along Park
regulatory Bushland Care
salvinia
pathways in the park’s
including the following and keep
lagoon (ensure watching
all asigns align with on new
briefNoosa’s Environment
Environmental control methods and
information
Investigate and
the the
need natural/cultural/recreational
for new internal trail and/or values that is
interpretative Group and 2016/2017 Council officer time (and
control
Design methods
2. Principles;
Continue
1. consistent Noosato inform
support
towith
Council’s
Council 2015d): pest control program.
the Heritage Park Bushland Care Group’s
Services
Services
Traditional team
team
Owner
Noosa Council’s (inand Ongoing (as per the
costs
Part of
to reduce
Council’s
the
current
extent
signs and/or this plan.
notice board. and TBC for any
of Salvinia new signs)
in the lagoon
environmental works which enhance the park’s bushland areas. consultation
groups
Parks where
Parksand with
Natural
Natural maintenance schedule pest management
1. Complete a review of current signage within the park and either Parks
Areasand
relevant)
Areas team
team Natural 2017/2018
in Appendix(subject
8) Council officer
to program and intimekind(and
(i.e.
3. Continue
Ecological to complete
restoration
2. Develop and within
install the
newscheduled
park’s regeneration
interpretative reserve
signs areas
at works
main per the
as(i.e.
access points Areas, local 2017/2018 New initiative ($200 per
remove or upgrade all signs asbushland
required. budget deliberations)
(subject to TBC for any
Bushland Caresignage
Group)
Noosa
excluding(as
theper Local
park’s
Figure Government
recreational
4) that includesArea Pest
areas) aincluding Management
map of the thepark Plan
following:
showing 2015- residents, Heritage budget deliberations) sign)
upgrades)
2019 and Heritage
infrastructure, Park
dog off Network
leash area etc.
BOAalong should
(this with be updated
regulatory Park Bushland Care
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.