2016-09-06 P&E Committee - Attachment 1 to Item 6 - Noosa Parklands Park Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Relevant
Relevantobjective Action
objective Action Responsibility
Responsibility Timing
Timing Required resources
Requiredresources
Engage ngage experts
11. Eexperts to assesstobushfire bushfire
assess fuel hazardfuel
forhazard
the parkfor
and
thebased
park on Noosa Council’s
NoosaCouncil’s N/A
2017/2018 (subject to Completed
New initiative ($1,000 for
the results this assessment,
andofbased Council
on the results of this
willassessment,
determine theCouncil burn
plannedwill Parks
Parksand Natural
and budget deliberations) expert to assess bushfire
frequency for the park.
determine the planned burn frequency for the park. Areas team
Natural Areas fuel hazard)
team Council officer time to
Relevant objective ActionCouncil officer time to determine burn frequency Responsibility Timing Required resources
determine burn
frequency
Engage xpand the
12. Eexperts to assess network
fire trailbushfire fuel all Noosa
to hazard Parklands
for the Park
park and based on Noosa Council’s
NoosaCouncil’s Year 4
2017/2018 (subject to New Expand fire trail
initiative network
($1,000 for
Page 28 | Noosa Council
bushland reserves (Figure 4). Maintain as part of Council’s
the results of this assessment, Council will determine the planned burn Parks and
Parks and Natural budget deliberations) cost $8000
expert to assess bushfire
Expand the fire trail network to all Noosa Parklands Park bushland Noosa Council’s 2015/2016 funded Estimate additional costs
operational
frequency maintenance schedule (see action below)
for the park. Natural
Areas Areas
team fuel hazard)
reserves (Figure 4). Maintain as part of Council’s operational maintenance Parks and Natural Expanded
through current fire trail to maintain fire trail
clearances
Include
schedule 1 m clearances
(see action below) along boardwalks to protect timber team
Areas team budget Council
along boardwalks timeandto
maintenanceofficer an
from bushfire. determine
include in burn
17/18
Include 1 m clearances along boardwalks to protect timber from bushfire additional $2000/annum
frequency
operational
Investigate design and costs to upgrade bridge access off 1 m debris budget
clearances
Expand
Carramar Street
trail
to allow
network
for Council,
Noosa
contractor or emergency
bushland Noosa 2015/2016 funded
around bridges an
Estimate additional costs
Continuethe to fire
slash the park’s fire
to alltrails andParklands
inspect trees
Parkalong the park’s Noosa Council’s
Council’s Ongoing (as per the Part of Council’s current
reserves service access.
4). Maintain as part of Council’s operational maintenance Parks through current additional
to maintain$2000/annum
clearances
pathways(Figure
and boundary fire trails. Parks and
and Natural
Natural maintenance schedule
fire trail maintenance schedule
Assess
schedule (see Endangered,
action below) Vulnerable, Neat Threatened (EVNT) Areas
Areas team
team budget
in Appendix 8) along
program
Officerboardwalks and
time for new
Noosa Parklands Park Management Plan
IncludeFauna
1 m clearances species
and Flora along and habitat
boardwalks that may
to protect potentially
timber be
from bushfire include in 17/18
bridge investigation and
impacted by works and avoid, mitigate or offset those impacts. operational budget
Relevant objective Action Responsibility Timing design
Required resources
Engage ato
Continue qualified arborist
the park’s complete
tofire anda pro-active
inspect risk/benefit
trees along the park’s Noosa
ArboristCouncil’s Ongoing
Ongoing (as
(as per the
per the Part
New ofinitiative for current
Engage
assessmentontinue
slashto
13. Cexperts trees slash
to assess
withinthe park’s
bushfire
trailsfire
fuel
park’s trails
hazard
recreationaland inspect
the
for areaspark trees
andand based
alongalongon Noosa Council’s
NoosaCouncil’s Ongoing (as
2017/2018
maintenance (subject
per to
schedule New ofCouncil’s
Council’s
Part initiative
2017/2018 current
($1,000 for
additional
pathways andofboundary firethe
trails. Parks and Natural maintenance schedule maintenance forschedule
the results
boundary park’s
of
thefire this pathways and
assessment,
trails. boundary
Council will determine
fire trails.the planned burn Parks
Parks andand
Areas team
Natural in
in
maintenance
budget deliberations)
Appendix
theAppendix 8)
8)
maintenance
expert
arborist
program
assess
toresourcesschedule
bushfire
frequency for the park. Areas team
Natural Areas schedule in fuel hazard)
program
(subject to Budget
Ensure that hazardous trees that have to be felled are removed from the
site or chipped. team Appendix 8) Review deliberations)
Council officer time to
Relevant objective Action Responsibility Timing Required resources
determine burn
Engage
14. Eangage
Continue qualified
the a qualified
mosquito arborist
surveysarborist
to complete
within complete
tothea pro-active pro-active
park to ainformrisk/benefit risk/benefit
Council’s vector Arborist
Arborist Ongoing
Ongoing (as(as per
perthe New of contract
Costinitiative
frequency for arborist
Engage experts to assess bushfire fuel hazard the park based Council’s
Noosa Council’s Ongoing (as
2017/2018 (subject
per theto PartNew of Council’s
initiative current
for
assessment
control assessment
program. of trees within
of trees the park’s
within therecreational for areas
park’s recreational andand
along
areas andon Noosa maintenance
the maintenanceschedule 2017/2018
$5000 for($1,000
additional
the of this assessment, Council will determine the planned burn Vector Control team
Parks and Natural maintenance
budget schedule
deliberations) maintenance
expert schedule
assess bushfire
boundary
resultsfire
Expandalong the fire trails.
boundary fire trails.
trail network to all Noosa Parklands Park bushland Noosa Council’s in Appendix
schedule
2015/2016 8)
infunded arboristtoresources
Estimate additional costs
frequency for the park. Areas team in Appendix 8) program
fuel hazard)
reserves
Ensure that (Figure
hazardous4). Maintain
trees that as part
haveoftoCouncil’s
be felledoperational
are removed maintenance
from the Parks and Natural through
Appendix current
8) fire trail to (subject
maintainto Budget
clearances
schedule E
nsure that hazardous
(see action below)
site or chipped. trees that have to be felled are Areas team budget Review
Council
along deliberations)
boardwalks to
officer timeand
Actionremoved
Continue
Relevant objective Include to maintain from the
road site or
culverts chipped.
at creek crossings
1 m clearances along boardwalks to protect timber from bushfire on Griffith Avenue, Responsibility
Noosa Council’s Civil Timing
Ongoing (as per the determine
Required
Part of
include burn
resources
Council’s
in 17/18 current
Continue
Carramar the Street, and Golf
mosquito Course
surveys Drive.
within the park to inform Council’s vector Works team maintenance frequency
maintenance
operational schedule
budget
Noosa Council’s Ongoing (as schedule
per the Part of Council’s current
15. C
control
Engage program.
experts
ontinuetothe mosquito
assess bushfiresurveys
fuel hazard
within forthetheparkparkto inform
and based on Noosa Noosa Council’s
Council’s Ongoing
in Appendix
2017/2018 (as 8)per
(subject to Part
New
Vector Control team maintenance schedule maintenance scheduleof
program Council’s
initiative current
($1,000 for
Expand
the
Continue Council’s
resultsthe this
tooffire
slash vector
trail
the control
network
assessment,
park’s fire program.
to CouncilNoosa
alltrails willParklands
and determine
inspect Park
treesthe bushland
planned
along burn
the park’s Vector
Noosa
Parks Control
Council’s
and Natural maintenance
2015/2016
budget
Ongoing
in
theAppendix(asfunded
deliberations)
8)per the maintenance
Estimate
expert
Part of to
program assess
Council’s schedule
additional costs
bushfire
current
reserves
frequency
pathways(Figure for the
and 4).
park.
boundary Maintain as part of Council’s operational maintenance Parks
fire trails. teamand
Areas teamNatural schedule
through current
maintenance in schedule program
to maintain
fuel hazard)clearances
fire trail maintenance schedule
schedule
Continue (see to investigate
action below)and enforce unauthorised actions within the park Areas Council’s
Noosateam As required
budget along Council’s current
Part ofboardwalks
under relevant Council laws (e.g. illegal dumping activities). Regulatory Services
Appendix
in Appendix8)8) program
Council officer timeand
to
Action
Continue
Relevant objective Include to maintain
Noosaroad culverts
localat creek crossings on Griffith Avenue, Responsibility
Noosa Council’s Civil Timing
Ongoing (as per the regulatory
Required
Part of
include services
resources
Council’s
in 17/18 current
1 m clearances along boardwalks to protect timber from bushfire determine
program burn
Carramar Street, and Golf Course Drive. Works team maintenance schedule frequency maintenance
operational schedule
budget
Engage experts to assess bushfire fuel
16. Continue to maintain road culverts at creek crossings onhazard for the park and based on Noosa Council’s
Noosa Council’s in Appendix
2017/2018 8)
(subject
Ongoing (as per to program
New initiative
Part of Council’s ($1,000 for
current
Engage
the results
Continue a qualified
to
Griffith of this
slash arborist
assessment,
the
Avenue, park’s to complete
fire
Carramar Council
trails anda
willpro-active
determine
inspect risk/benefit
treesthe
Course planned
along the
Drive. burn
park’s Arborist
Parks
Noosa and Natural
Council’s
Civil Works team Ongoing
budget
Ongoing (as
(as
the maintenance per
per the
deliberations)
the New
expert
Part initiative
of to assess
Council’s
maintenance for bushfire
current
schedule
Expand
assessment the fire trail network
trees within all Noosa
to park’s Street,Parklands
and Golf Park
recreational areas bushland
and along Noosa Council’s 2015/2016
maintenance funded Estimate
2017/2018 additional costs
additional
frequency forofthe
and park.
boundary firethe
trails. Areas and
teamNatural maintenance
schedule in schedule fuel
schedule maintenance
hazard)forschedule
program
reserves
pathways(Figure
Continue to 4).
investigate
boundary fire trails. Maintain
and as
enforce part of Council’s
unauthorised operational
actions withinmaintenance
the park Parks
Parks and
Noosa Natural
Council’s through
As current
required
Appendix 8) fire trail to maintain
Part of
arborist clearances
Council’s
resources current
Action
Relevant objective schedule (see action Areas
Areas team
Responsibility
team in
in Appendix
Appendix
Timing 8)8) program
Council
Required
along officer time to
resources
boardwalks
under relevant Noosabelow)
Council local laws (e.g. illegal dumping activities). Regulatory Services budget regulatory
(subject services
Budgetand
Ensure
Final draft Noosa Parklands Parkthat hazardous
Management trees
Plan that have to be felled are removed from the determine
include
program
to burn
in 17/18 page | 28
Include
site 1 m clearances along boardwalks to protect timber from bushfire Review deliberations)
17.or chipped.
Engage Cexperts
ontinuetotoassess investigate
bushfireandfuel enforce
hazard unauthorised
for the park and actions
based on Noosa Council’s
NoosaCouncil’s 2017/2018 operational
As required(subject to frequency
New
Part initiative budget
of Council’s current
($1,000 for
the results
Engage within of this
the
qualified
athe assessment,
park under
arborist Council
relevant
to complete will
Noosa determine
Council
a pro-active the planned
local
risk/benefitlaws burn
(e.g. Parks and
Regulatory
Arborist Natural budget deliberations)
Ongoing (as per the expert to
regulatory assess bushfire
services
New initiative for
Expand
Continuethe
frequency mosquito
thetrail
park. surveys
network within
all Noosa the park to inform Council’s
bushland vector Noosa
Areas Council’s
team 2015/2016 (asfunded the Part
Estimate
fuel Council’s
hazard)additionalcurrent
costs
Continue
assessment toforfire
illegal slash
ofdumping
treesthe park’s fire
activities).
within the trails
to park’s andParklands
inspect trees
recreational Parkalong
areas and the park’s
along Services Ongoing
Ongoing (as
maintenance per
per the
schedule Part of
of Council’s
program
2017/2018 current
for additional
control
reserves program.
(Figure 4). Maintain as part of Council’s operational maintenance Parks Control
Vectorand Natural maintenance
team through currentschedule
fire trail maintenance
to maintain schedule
clearances
pathways and
boundary fire trails. boundary fire trails. maintenance
in Appendix 8) schedule maintenance
Council
arborist officer schedule
time to
resources
schedule (see action below) Areas team budget
in
in Appendix
Appendix 8) 8) program
along
programboardwalks
determine
(subject to burn
Budgetand
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.