2016-09-06 P&E Committee - Attachment 1 to Item 6 - Noosa Parklands Park Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn These actions are in addition to those already outlined in other Noosa Council documents, such as the Noosa Plan Noosa Council 2013, Noosa
The
Localmajority of management
Government actions highlighted
Area Pest Management Plan 2015-2019
below are(Noosa
part ofCouncil programs
existing2015a), Noosa projects
andLocal and through
Disaster the very
Management Planactive community
2015-16 (Noosa
Council 2015b)
volunteer work. and
However,
NoosatoBushland
enhance Reserve Fire Management
current programs and activities 2015 (Noosa
Plan further fundingCouncil 2015c).
by Council is proposed, subject to budget deliberations.
Relevant objective Action Responsibility Timing Required resources
Relevant
These objective
actions
Relevant objective
Action
are in addition
Continue
Action to those
to monitor the already
presenceoutlined
of salviniain
in other Noosa
the park’s Council
lagoon and keep
Responsibility
documents,
Noosa such as the
Council’s
Responsibility
Timing
Ongoing
Required
Council
Noosa Plan NoosaPart
Timing
resources
2013,
of Council’s
Required Noosa
current
resources
watching
Local Government aArea Pestbrief
Management methods
on new controlPlan to inform Council’s
2015-2019 (Noosa pestCouncil
control2015a), and Natural
ParksNoosa Local Disaster Managementpest
Planmanagement
2015-16 (Noosa
7. Investigate measures
program.
Review/upgrade/install signs minimise
to within the park’s of spreading
the riskrecreational weeds,
areas Noosa
Noosa
and along Areas Council’s
team
Council's Ongoing (as per Part of Council’s current
program
Noosa
such as
Council 2015b) andpathways Bushland
including
review theReserve
andfollowing
Fire Management
update contract conditions
(ensure all signs align
Plan
mowing
forwith 2015 (Noosa
Noosa’s
Council
Parks and 2015c). the maintenance
Environmental operational program
Design contractors
Principles; to mow
Noosagrassed
Councilareas2015d): within the park only, and wash Services
Natural team
Areas(in schedule in
To minimise
down mowers of spreading
the riskonsite after weeds, review and update contract
use. Noosa
team Council’s
consultation with Ongoing
Appendix
(as8)per the Part of Council’s current
Relevant objective conditions
Action for mowing contractors to mow grassed areas within the park Responsibility
Parks Timing
maintenance Required resources
schedule operational program
1. Complete a review of current signage within the park and either Parks and
and Natural
Natural 2017/2018 to Council officer time (and
only, and wash down mowers onsite after use. Areas
Areas, team in Appendix(subject
8)
8. Communicate
remove orwith
Review/upgrade/install upgrade
local all signs
signsresidents
within the required.
asregarding
park’s the negative
recreational areasimpacts Noosalocal
and along Noosa Council’s
Council's budget deliberations)
Ongoing TBC
Partfor
of any signage
Council’s current
associated dumping garden waste or allowing garden weeds residents, Heritage
Environmental upgrades)
operational program
pathways including
with the following (ensure all signs align with Noosa’s Environmental
Communicate local residents regarding the negative impacts Park
Noosa Bushland
Council's Care Ongoing Part of Council’s current
Design Principles;
to spread into Noosa
withBushland Council
Reserves2015d):(via media releases, education Services
Services team,
team (in
associated2. Investigate
with dumpingthe need
garden for new
waste internal
or trail
allowing and/or
garden interpretative
weeds to Group and
Environmental 2016/2017 Council officer
operational time (and
program
material and Bushland Care workshops). consultation with
spread signs and/or
Bushland Reserves board.
(via media releases, material Traditional
Parks andOwner
Services (in TBC for any new signs)
1. into
Complete a review
notice of current signage withineducation
the park and either Parks andteam
Natural Natural
Areas, 2017/2018 (subject to Council officer time (and
and workshops). groups where
consultation
remove or upgrade all signs as required. Areas,
local local with
residents, budget deliberations) TBC for any signage
relevant) Natural
3. Develop and install new interpretative signs at main access points Parks residents,
and Heritage
Heritage Park 2017/2018 (subject to New initiative ($200 per
upgrades)
(as per Figure 4) that includes a map of the park showing Areas, local
Park Bushland Care budget deliberations) sign)
Bushland
residents, Care
2. infrastructure,
Investigate thedog need leash
offfor newareainternal along
etc. trail with regulatory
and/or interpretative Group andHeritage 2016/2017 Council officer time (and
information natural/cultural/recreational values that is
Group
Park
Traditionaland
BushlandOwner Care
signs and/orand notice
the board.
Noosa Landcare) TBC for any new signs)
consistent with this plan. Group and
groups where Noosa
Relevant objective Action Landcare)
relevant)
Responsibility Timing Required resources
3. Develop and install new interpretative signs at main access points 2017/2018 (subject to New initiative ($200 per
9. Install safety
Ecological restoration around
fencewithin the Tinaroo
park’s Park playground.
bushland reserve areas (i.e. Noosa Council’s Year 1 $5000
(as per Figure 4) that includes a map of the park showing budget deliberations) sign)
Develop
Continue
excluding atolinking
themonitor
park’spathway
bench seats at
Installinfrastructure, the at
recreational
two the
presence southern
of salvinia
areas) end
in
includingof
the Heritage
park’s
the Park
lagoon
following: (including
and keep Noosa and
ParksCouncil’s 2017/2018
Ongoing
Year 1 (subject to Part
New ofinitiative
Council’s current
dog offplaygrounds.
leash area etc. along with regulatory $3000
boardwalk)
a watching and install
brief on new bench
a control seat
methods the playgrounds
at twotoofinform Council’s (Figure
pest 4).
control Parks
Natural Natural
andAreas budget deliberations) pest management
$55,000 for new pathway
Install information
netball hoopand the
and postnatural/cultural/recreational
at the basketball values that is
This
program. should
1. include
Continue reviewing
to support
consistent with this plan. boardwalk
the Heritage design
Park to allow
court.for
Bushland free
Care flowing
Group’s of Areas
team
Noosa team
and Asset
Council’s Ongoing
Year 1 (as per the program
Part
$800 of Council’s
water born debris (e.g. arched design). $20,000 for new current
environmental
Investigate works which
wheelchair/disabled access
enhanceneeds the park’s
for Heritage
bushlandPark. areas. Parks and Natural
Planning team maintenance
Year 2 schedule pest management
boardwalk
Install 2.
Ecological a netball
Continue hoop
restoration at the basketball
complete
within thescheduled
park’s court regeneration
bushland reserve works
areas as per the
(i.e. Areas team in Appendix 8) program
TBA and in kind (i.e.
To U pgrade
minimise existing
the risk
toofbitumen
spreading pathway
weeds, (Carramar
review and Palmer
toupdate Crescent
contract Noosa Council’s Ongoing
Year 2 (as per the Part
$1000 Council’s
of for
Bushland bench current
seats
Care Group)
excluding
conditions
entry).Noosathe park’s
for mowing Government
Localrecreational
contractorsareas) toArea
mow Pest Management
including
grassed the following:
areas within
Planthe 2015-
park Parks and Natural maintenance schedule $30,000
$300 for netball
operational hoop
program
only, and2019 washand down Heritage
mowers Park Network
onsite BOA (this should be updated
after use. Areas team in Appendix 8)
U pgrade
1. Park vehicle (Palmer Funding subject to
Continue
bridgetoHeritage
support the Heritage
SW forPark Bushland
accessCare Group’s Noosa Council’s Ongoing
Year 2 (as per the Part of Council’s
$20,000
approval through current
the
Crescent entry)
environmental works which enhance the park’s bushland areas. Parks and Natural maintenance schedule pest management
Priority Infrastructure
Communicate
Upgrade with local
footbridge residents
Heritage
to complete regarding
Park SW the negative
(Palmer impacts
Crescent entry) Noosa Council's
Areas team Ongoing
in Appendix 8) Part of Council’s
program current
and in kind (i.e.
Final draft Noosa Parklands2. ParkContinue
Management Plan scheduled regeneration works as per the Year 2 Program
$7000 (PIP) page | 25
associated with dumping
Noosa garden waste
Local Government allowing
AreaorPest garden weeds
Management to
Plan 2015- Environmental operational
Bushland program
Care Group)
R
spread aise pathways
into Bushland (low level boardwalks)
Reserves releases, Park east that
Heritageeducation Services team (in Year 2
2019 and Heritage Park(viaNetwork
media BOA (this should be material
updated $10,000
andsometimes
workshops). remain inundated after flooding. Pathway on west side consultation with
Continue
of lagoon to monitor and maintain
to be monitored the park’s
at this stage.recreational areas and Parks
NoosaandCouncil’s
Natural Ongoing (as per the Part of Council’s current
associated infrastructure (e.g. signs, pathways, boardwalks, tables, Parks and
Areas, localNatural maintenance schedule operational program
D
playgrounds,
evelop abasketball
linking pathwaymowing at the southern
and bindiend of Heritage Park.
spraying). inYear 3
Appendix 8) $55,000
Final draft Noosa Parklands Park Management court, Plan residents,
Areas teamHeritage page | 25
Include a bridge design to allow for free flowing of water born debris Park Bushland Care
(e.g. arched design). Group and Noosa
Landcare) Year 3 $15,000
(see Figure 4 for locations)
Develop a linking pathway at the southern end of Heritage Park (including Noosa Council’s 2017/2018 (subject to New initiative
10. Continue
boardwalk) andto monitor
install a bench maintain
andseat at two the park’s
of the recreational
playgrounds (Figure 4). Noosa
Parks andCouncil’s
Natural Ongoing
budget (as per
deliberations) Part of Council’s current
Park Management $55,000 for new pathway
page | 27
Noosa Parklands Park Management Plan
Final draft Noosa Parklandsareas and associated
Plan infrastructure (e.g. signs, pathways, Parks and the maintenance operational program
This should include reviewing boardwalk design to allow for free flowing of Areas team
born debris (e.g.
waterboardwalks, arched $20,000 for new
tables, playgrounds,
design). basketball court, mowing Natural Areas schedule in
boardwalk
and bindi spraying).
Install a netball hoop at the basketball court team Appendix 8)
$1000 for bench seats
$300 for netball hoop
Noosa Council | Page 27
Funding subject to
approval through the
Priority Infrastructure
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.