INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                        17 JUNE 2014


Number of properties completed by condition
Bed Level in front of                                                                                                 Percent
                                      cumulative    No.   Cummulative
Revetment Wall           % of Total                                            Total completed to date              complete to
                                         %       (approx)    Total
(m) AHD                                                                                                                date
                                                                        Stage 1        Stage 2        Stage 3
  >0.00 at or above
        design             11%          100%       58        509          0               0               3             5%
<0.00 (-0.01 to -0.15)
    below design           37%           89%       186       451          4               2               5             6%
    -0.16 to -0.20          6%           52%       33        265          0               11             N/A           33%
    -0.21 to -0.25          7%           46%       36        232          0               6              N/A           17%
    -0.26 to -0.35         16%           39%       80        196          1               22             N/A           29%
    -0.36 to -0.45         15%           23%       76        116          3               24             N/A           36%
    -0.46 to -0.55          4%           8%        20         40          4               14             N/A           90%
        <-0.55              4%           4%        20         20          19              1              N/A           100%
Total                                                 509                         31             80             8
Note:
         The number of properties is based on original consultant estimates which may not take
         into account parks, drainage easements, road reserves and all rateable properties.

         Those properties from future stages that have been carried out to date is due to
         movement identified in the revetment wall or practicalities and efficiencies in completing
         ahead of the next stage being undertaken.




                          Waterside Court, Noosa Waters – material loading access point


Previous Council Consideration

The capital works program has previously been distributed to Councillors (document titled
“Noosa Council Draft Capital Works Program 2013/2014”, Version 1.0, 20/12/2013).



                                                                                                              Page 55 of 86
Log in to download the original file

2014-06-17 Infrastructure and Services Committee Agenda(PDF, 6MB).pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.