INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 17 JUNE 2014
Number of properties completed by condition
Bed Level in front of Percent
cumulative No. Cummulative
Revetment Wall % of Total Total completed to date complete to
% (approx) Total
(m) AHD date
Stage 1 Stage 2 Stage 3
>0.00 at or above
design 11% 100% 58 509 0 0 3 5%
<0.00 (-0.01 to -0.15)
below design 37% 89% 186 451 4 2 5 6%
-0.16 to -0.20 6% 52% 33 265 0 11 N/A 33%
-0.21 to -0.25 7% 46% 36 232 0 6 N/A 17%
-0.26 to -0.35 16% 39% 80 196 1 22 N/A 29%
-0.36 to -0.45 15% 23% 76 116 3 24 N/A 36%
-0.46 to -0.55 4% 8% 20 40 4 14 N/A 90%
<-0.55 4% 4% 20 20 19 1 N/A 100%
Total 509 31 80 8
Note:
The number of properties is based on original consultant estimates which may not take
into account parks, drainage easements, road reserves and all rateable properties.
Those properties from future stages that have been carried out to date is due to
movement identified in the revetment wall or practicalities and efficiencies in completing
ahead of the next stage being undertaken.
Waterside Court, Noosa Waters – material loading access point
Previous Council Consideration
The capital works program has previously been distributed to Councillors (document titled
“Noosa Council Draft Capital Works Program 2013/2014”, Version 1.0, 20/12/2013).
Page 55 of 86
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.