TOD ONSULTING
greatly increased, to include some areas of the permanent structural floors,
probably exceeding 1500m2.
The successful Contractor will be required to provide, as a contractural
condition of the building approval, a detailed Construction Management
Plan appropriate for this site and the extent of piling, excavation and
concreting work. The Plan shall cover the following issues:-
• Pre-construction
Submit a programme, construction method statements, traffic &
parking management plan, environmental and erosion protection
measures, nominated tree protection measures, etc as per
specifications, for approval. Complete Existing Condition Dilapidation
Inspection reports on surrounding buildings, and access driveway.
• Initial Site Access and Parking
Construct temporary benching and turn-around areas on site and
establish site office, temporary utilities connections, and survey
monitoring. Build sediment & erosion control measures, temporary
stormwater collection and disposal.
It may be economical to lease additional vacant land in the area to
provide temporary parking of construction vehicles, and storage of
equipment and materials. A vacant lot exists on McAnally Drive.
Parking would be prohibited in the access driveway running from
Seaview Tce to the site, and in the Council Beach Carpark.
• Contiguous Piling
Complete ground injection grouting, temporary access tracks and/or
platforms, and install CFA contiguous piles. The grout piling rig can
be off-loaded in Seaview Tce and driven on rubber tracks to the site,
as discussed with a Piling contractor, cement grout and reinforcing is
to be delivered progressively as the piling proceeds.
Temporary parking and materials storage will be at the south west
corner of the site.
• Excavation Works
A small excavator will be sufficient to remove and load sand into
normal-sized tip trucks for removal from site, perhaps with a small
hoist, Conveyor or crane from lower terraced areas.
Stockpiling of material on site will be limited by Geotechnical
approval to avoid localised surface slips. Subject to more detailed
analysis it may be possible to stockpile some materials in areas where
the stiff clays and/or weathered sandstone are closer to the surface.
Temporary access ramps & terraces can then be constructed below the
contiguous piled walls to create additional temporary parking and
storage areas across the site. Refer to our drawing 09578 - P4.
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0169 Information Response to DERM - 71 Seaview Terrace Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 14.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.