TOOCONSULTING
• Foundations and Screw Piling
Once the main bulk excavation levels have been achieved, stable
terracing can be prepared to expand access, parking and material
storage on-site.
The Screw Piling Rig can be brought in on rubber mats from Seaview
Terrace, and piles delivered in short lengths and welded together on-
site as lengths of pile are installed.
• Pool/TerraceBedroom 5 Building
This area is directly connected to the main house construction by an
enclosed corridor and will be securely founded on a deep contiguous
piled wall and on deep screw piles laterally tied back by raking screw
piles to withstand the anticipated downhill sand pressure and other
lateral loads such as earthquakes and wind loadings. Temporary
access to this area will be limited by existing vegetation which must
be preserved, so it is anticipated that a crane will be used to deliver
materials to this area in conjunction with temporary piled stair/ramp
access.
• Structural Works
The remainder of the foundations, floor beams, slabs, columns etc, can
be constructed by traditional methods with materials being delivered
readily via the access driveway as required. The length of construction
materials will be limited by the size of delivery vehicles which can
safely access the bitumen driveway.
• Construct elevated timber walkway by using either temporary screw
piles and access platform or mini bentonite concrete piling rig (2m x
1.2m) to avoid damage to existing vegetation.
3.5 Construction of Retaining Walls and Excavations
The majority of the site is sloping at approximately 26° towards north-east
while the south-east and north-west areas of the block slope much more
steeply at around 32° towards the east.
Any material above a 27° line projected from the base of the hill of slope
is considered unstable and totally unsuitable for supporting any permanent
foundations or landscape structures.
The bedrooms and pool/terrace structure will be located on a steep
unstable area and will hence be supported on deep piled foundations
which will be laterally restrained by deep tension piles, sufficiently strong
to withstand the potential slippage of sand downhill against the footings
and piles.
The area along the western boundary slopes at approximately 26° and up
to 30° at the north-west corner, however the area uphill of to McAnally
Drive. The area west and uphill of the site is occupied by light-weight
timber residential structures, and a reinforced concrete pool supported on
deep piled foundations.
8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0169 Information Response to DERM - 71 Seaview Terrace Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 14.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.