                                                           TODCONSI


Our design and suggested construction procedure has taken into account
the critical staged nature of the proposed excavations, close proximity of
adjacent properties (especially the piled pool structure), the additional soil
loadings due to the uphill gradient, the loose and unstable nature of the
upper sand layers (particularly when vegetation is removed or disturbed)
and the limitations of piling machine size which can access the site.

The key features of our design and construction proposed are:-

•    Stabilise surface sands along western boundary using URETEK (or
     similar) ground injection
•    Establish survey markers across site and on adjacent properties for
     continual regular monitoring during construction
•    Install extensive "Sediment/Erosion Control" fences
•    Install temporary stormwater collection and disposal system; install
     permanent 450mm stormwater drain in short sections, spoon drain and
     gully pits along west boundary.
•    Avoid ground vibrations
•    Prepare engineered truck tum-around area(s) and access tracks/ramps
•    Construct piled temporary access or engineer-designed cut-fill access
     for 50T CFA pile rig and complete the western contiguous piled walls
•    Progressively remove sand east of new walls and establish temporary
     propping or ground anchor system. The ground tension anchoring
     would be the more economical procedure if adjacent owners give
     permission, but if this is not allowed, compression strutting is quite
     feasible within the site, or top-down construction could be utilised.
•    Extend temporary access/storage/ramp areas towards north and back to
     south-east
•    Complete roof slab (top-down method) for the main house structure or
     continue excavation and propping/anchoring to required levels
•    At all times the retaining walls are fully propped, drainage is in place,
     and the CFA piling rig is operating on stable flat platforms without
     any risk of slip or toppling
•     Floor slabs laterally restrained by raking piles will provide permanent
      horizontal strutting to the base of retaining walls
•     Excavated sand can he removed by small hoist, conveyor belt, or crane
      to dump trucks and used as excellent clean fill at another project
•     Piling contractors have advised it is quite feasible to move the CFA
      piling machine on rubber matting or use rubber tyres on the tracks
      from the Seaview Terrace cul-d-sac to the site
 •   Once the contiguous piled retaining systems, piling, screw piles and
     raking piles are in place (gradually progressing downslope), the
     remaining work will be typical formed in-situ reinforced concrete
     construction
 •   Sub-floor drainage will be connected through all contiguous piled
     walls into vertical "wick" drains at approx. 4m centres
 •   Grout piled walls will be patched and grouted where necessary
     A "dry" internal masonry wall and drained cavity will be provided at
     all contiguous piled retaining walls


                                                                             9

Used in these records

About this file

File size
14.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0169 Information Response to DERM - 71 Seaview Terrace Sunshine Beach.pdf · 14.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.