2015-04-07 Item 2 - Attachment 1 - Pre feasibility Study of Electric Bus Routes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
An estimated repair and cost per kilometre of $0.37 has been applied to all model instances
of Sunbus diesel buses in fleet calculations. This figure is based on information provided by
TransLink. A cost figure of $0.10 per kilometre has been applied to electric buses based on
data provided by manufacturers. A driver cost per kilometre of $1.41 has been provided by
TransLink, this has been applied across all of the modelled fleet options. All costs have been
discounted (at 7%) for ease of comparison.
As with the financial model, upfront purchase costs and estimated maintenance and
servicing costs were calculated in the financial model based on data received from
manufacturers in response to the EOI. The results of the 10 year operational model NPC on
these data are tabulated in Table 14. Once again, the upfront purchase costs include
capitalised costs of necessary infrastructure installation for each electric bus (e.g. two
charging stations).
Table 14 Operational Model Estimated Discounted Costs of Bus Options1
Fleet Sunbus Sunbus Sunbus
Rigid Rigid Rigid
Optare Solo BYD eBus Sunbus
10m Rigid
BYD eBus
Optare Solo
10m BYD
eBus
Expected lease lifetime 10 years 10 years 10 years
Number of Refuelling / Charging Stations 2 2
Total Estimated Fleet Cost (discounted) $6,730,264 $6,806,152 $5,063,627
Total Estimated Fleet Saving (discounted) -$1,666,638 -$1,742,525 $0
Total Estimated Fleet Fuel Costs (discounted) $716,401 $772,218 $986,266
Total Estimated Fleet Fuel Saving (discounted) $269,866 $214,049 $0
The model assumptions relied upon in the cost analysis is detailed below in Table 15.
Table 15 Upfront Purchase Costs and Maintenance and Servicing Cost
Assumptions2
Summary of Assumptions Per Annum
General Assumptions
Interest rate 5.00%
Discount rate 7.00%
Specific Assumptions (Annual increases)
Charging station electricity inefficiency 8.00%
Fuel prices 6.00%
1
Over an assumed lease period of 10 years with 20% residual. Costs include estimates of repair, maintenance and
driver costs per km. Excluded costs include but are not limited to, wear and tear, staff training and operating costs,
vehicle storage and security requirements to lease space from the bus depot or allocate space at the Council depot
in Noosa, support labour costs, meal allowance and various labour on costs.
2
Over an assumed lease period of 10 years with 20% residual.
52 | GHD | Proposal for Noosa Council & TransLink Division - Planning Report
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.