CONCLUSION
This Stormwater Management Report has outlined how the stormwater run-off from the site is to be managed to
comply with the relevant requirements to minimise any adverse impacts to the downstream environment.
• The lawful point of discharge test for the proposed development is achieved as the development continues
to discharge via the existing flow paths from the site. Assessment of the impacts arising from the
development have found the relative increase is insignificant and therefore is not likely to impact or cause
nuisance to the downstream properties.
• DRAINS modelling of the catchments under 2100 climate conditions has found that the maximum peak flow
rate increase resulting from the development is only a 1.6% upon the existing flow rates which is insignificant.
Attenuation is therefore not considered to be necessary within the development.
• As a large rural property with mostly pervious ground areas, the development is not required to achieve the
stormwater quality objectives of the SPP2017. Notwithstanding, the development will minimise pollutants
and nutrients from impacting downstream waterways through some key strategies. The majority of roof run-
off being generated within the development will be captured and stored for reuse and water conservation,
and the new road surfaces will grade across pervious areas as sheet flow providing a buffering treatment
and nutrient uptake to improve water quality before it enters the downstream receiving environment.
• Review of the Noosa Council flood mapping has found the site is not impacted by storms up to and including
the 1% AEP storm event, however roads to nearby townships may be cut-off during these storms. A Flood
Emergency Management Plan shall be prepared for the site to describe a suitable shelter in place strategy
within the site.
• The extension of an existing dam will be used to create an at-grade canoe run. The extension works are to
be managed to minimise impacts on the local ecosystem and downstream waters at all time during
construction. Once operational, the existing dam levels and overflows will be unchanged, and no impacts to
downstream properties are expected as a result of the works.
• During construction, erosion and sediment control measures in accordance with best practice standards are
to be implemented to minimise potential contaminants impacting the downstream receiving environments.
An erosion and sediment control plan shall be developed as part of a future operational works approval.
• The proposed development is able to be effectively managed to ensure that stormwater is captured and
conveyed through the site, without causing nuisance flows to adjacent or downstream properties, and in
conjunction with contribution charges towards a future treatment area, the development is able to satisfy the
Noosa Shire Council requirements for stormwater quality and quantity.
Project number 20220146 Page 17 of 20
File RECOR Stormwater Management Plan- 20220146.docx, 2022-09-06 Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.