Original source · versioned page text
Att8 - SWMP
The original of this document is very large (25.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 16, section 1. The text section number identifies this passage in the reader.
The storage requirements for each village are therefore recommended as
• Village 1 – 350KL, import of 400KL to supplement in Aug to November
• Village 2 - 250KL with no need to import potable water throughout the year
• Village 3 - 175KL, with no need to import potable water throughout the year
The communal area will also require potable water storage, with a nominal 200KL proposed. It should be noted
that this modelling has not allowed for any storage for Fire Fighting supply.
Project number 20220146 Page 16 of 20
File RECOR Stormwater Management Plan- 20220146.docx, 2022-09-06 Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.