Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Bushfire Hazard Assessment

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                       BHA Report for36 Riverpark Drive, Ringtail Creek




 Performance Outcomes                      Acceptable Outcomes                        Compliance

 PO3                                       AO3.1
 Development provides an adequate          Premises are connected to the
 water supply for fire fighting purpose    reticulated water supply.
 which is reliable, safely located and     OR
 freely accessible.                        AO3.2
                                           Where there is no available reticulated
                                                                                      A water impound is located on the
                                           water supply, the premises has:
                                                                                      property at the NW extent.

                                              1. an accessible dam, swimming
                                                 pool or water tank available for
                                                 fire fighting purposes with an
                                                 onsite water volume of not less
                                                 than 5,000 litres; and
                                              2. a water supply outlet pipe 50
                                                 millimetres in diameter fitted
                                                 with a standard fire brigade
                                                 fitting connected to the water
                                                 supply (other than where the
                                                 water supply is in a swimming
                                                 pool or dam).

 PO4                                       AO4.1
 Essential community infrastructure is     Development involving essential            Not Applicable
 able to function effectively during and   community infrastructure is not located
 immediately after bushfire events.        within a medium or high bushfire
                                           hazard area.
                                           OR
                                           AO4.2
                                           Where located in a medium or high
                                                                                      Not Applicable
                                           bushfire hazard area, development
                                           involving essential community
                                           infrastructure is designed to function
                                           effectively during and after a bushfire
                                           event in accordance with a Bushfire
                                           Hazard Management Plan.




+ Bushfire assessments
+ Property vegetation assessments
+ Site planning for bushfire
+ Property management for bushfire                                              Bushfire Planning Specalists - qldbushfireplanning.com.au
+ Bushfire management plans
Log in to download the original file

Bushfire Hazard Assessment.pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.