Page 118 of 135
Category item _| Proposed Actions Responsibility Status |
Buildings & Facilities- |3.4 Investigate the installation of Energy Management Systems at relevant sites. 2017-18 Carbon reduction Project |Underway
Highest Emission Sites Officer
Officer
Officer
[Depot 3.7 Ar conditioning upgrade 2017-18
Noosa Aquatic Centre Lighting Upgrade 2018-19 Not started
Officer
Noosa Aquatic Centre Solar PV Installation 2017-18
Officer
Officer
Officer
Air conditioning improvements 2017-18 [Community facilities [Ongoing |
Noosa Leisure Centre Solar PV Installation 2017-18
Officer
Noosa Leisure Centre LED lighting upgrade (residual) 2018-19 Not started
Officer
LED lighting upgrade 2017-18
Air conditioning improvements 2017-18
Cooroy Library Solar PV Installation 2018-19 Not started
Officer
Tewantin Admin Building LED lighting upgrade 2018-19 Not started
Officer
Tewantin Admin Building }3..19 — |Air conditioning improvements TBA Infrastructure Planning, |Not Started
Design & Delivery
Tewantin Admin Building Solar PV Installation 2018-19 Not started
Officer
Noosaville Library 3.21 LED lighting upgrade 2018-19 Infrastructure Planning, |Not Started
Design & Delivery
Noosaville Library 3.22 Air conditioning upgrade 2018-19 Infrastructure Planning, |Not Started
Design & Delivery
Noosaville Library Solar PV Installation 2018-19 Not started
Officer
Noosa River Caravan 3.24 Solar PV Installation 2019-20 Carbon reduction Project |Not started
Park Officer
Buildings & facilities - |3.25 Conduct audits of small sites to identify opportunities for emission reductions 2018-19 Carbon reduction Project |Not started
small sites Officer
Street Lighting
Design Standards Revise Engineering Design Standards to incorporate the requirement for energy efficient lamps to be provided in all [2017-18 Not started
new public lighting infrastructure, and that auto dimming or motion sensors also be provided as appropriate. Design & Delivery
Rate 3- Council owned |3.27 |Conduct a audit of all Rate 3 lighting assets to determine condition and identify requirements for upgrade of poles and |2018-19 Carbon reduction Project |Not started
streetlights fittings to accommodate more energy efficient lamps. Officer
Page 118 of 135See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.