2018-01-15 General Committee Agenda

of 135

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 117 of 135

Category                litem | Proposed Actions                                                                                                                      Responsibility         Status        |
 2.0 REDUCE EMISSIONS - Scope 1
 Transport Fuels
 Behaviour change          2.1      Continue to promote the use of Skype and teleconference calls for business meetings in lieu of driving toa meeting [2016-17        Carbon Reduction Project ongoing
                                   venue and improve awareness of help guides available on the intranet.                                                               Officer
 Behaviour change                   Provide staff education on eco driving fuel saving measures.
                                                                                                                                                                       Officer
 Fleet                     2.3      Continue to ensure that new and replacement programs provide ‘fit for purpose’ and 'best in class' fuel efficiency Ongoing         Procurement & Fleet    ongoing
                                   vehicles and plant.
                                   Analyse available technical information and assess suitability of trial of use of hybrid trucks for field maintenance
                                   activities.
 Fleet                     2.5     Analyse available technical information and assess suitability of trial of use of hybrid or alternative energy fleet Ongoing        Procurement & Fleet    Ongoing
                                   vehicles
 Stationary Fuels
 Stationary plant and      2.6      Purchase electric/battery plant and equipment to replace fossil fuel power equipment.                              Ongoing         Procurement & Fleet    Ongoing
 equipment
 Refrigerants
Air-conditioning                    Develop air conditioning guidelines to include refrigerants with the lowest possible global warming potential.     2019-20                                Not started
                                                                                                                                                                       Officer
 Landfill emissions
Waste                      2.8      Conduct an audit of the waste disposed to Council landfill to accurately measure the % of organic waste for emission |2017-18     Waste & Environmental   |Not started
                                  calculations.                                                                                                                        Services
                                    Develop an emission reduction strategy for the landfill                                                            2018-19                                Not started
                                                                                                                                                                       Services
Strategy                            Implement Council's Waste Reduction and Recycling Plan .
                                                                                                                                                                       Services
                                    Provide intermediate capping for landfill cell # 2.1                                                               2016-17                                Complete
                                                                                                                                                                       Services
                                    Install additional bores in the new capped area to capture additional gas flare.                                   2016-17                                Complete
                                                                                                                                                                       Services
                                    Investigate feasibility of flared gas being used for electricity generation.                                       2017-18
                                                                                                                                                                       Services
                                    Determine opportunities to increase Land Fill Gas extraction in conjunction with LMS - e.g. lateral extraction lines. 2017-18
                                                                                                                                                                       Services
 3.0 REDUCE EMISSIONS - Scope 2
 Council Owned Building and facilities
 Buildings & Facilities-   |3.1     i. Assess and analyse energy usage profile;                                                                        2016-17         Carbon reduction Project |Complete
 Highest Emission Sites             ii. Identify solutions to reduce energy consumption;                                                                               Officer
                                    ili. Scope requirements and provide estimates;
                                    iv. Undertake cost-benefit analysis to determine most effective approach (includes payback periods and financing
                                   options.)
                                   v. Develop a staged prioritised capital replacement and renewal program together with estimated costs to inform
                                   future capital works programs.
 Buildings & Facilities-   3.2      Provide a budget allocation for Whole of Shire minor works to cover replacement of lighting, installation of sensors or |Ongoing   Financial Services     Ongoing
 Lower Emission Sites               upgrade of timers at minor sites included in the carbon footprint (e.g. public amenities buildings, minor corporate
                                    buildings such as Landfill Office & workshop, Pomona Works Depot etc.)
 Buildings & Facilities-   [3.3     Implement Major Actions arising from the ERM Energy Audits .                                                       Ongoing         Carbon reduction Project |Ongoing
 Highest Emission Sites                                                                                                                                                Officer
                                                                                                                                                                                       Page 117 of 135
Log in to download the original file

2018-01-15 General Committee Agenda(PDF, 13MB).pdf · 13.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.