GENERAL COMMITTEE MEETING AGENDA 15 JANUARY 2018
33. Carparking shall be provided within the site generally as shown on the approved
plans. Carparking shall include 285 carpark spaces with 250 of these to be covered
carpark spaces, and include 10 clearly defined disabled carpark spaces for the unit
component of the development. Five carparking spaces for staff in addition to
resident and visitor spaces are to be provided on site. Visitor and staff carparking,
including all at grade car parking situated between Blocks 2 and 3 must be
maintained in common property and be available to all units. Motorcycle/scooter
parking spaces may be incorporated at a rate of 4 spaces equivalent to 1 car space.
47. All stormwater drainage shall be managed so that:
a. there is no net increase in 1 year ARI peak stormwater flows from the site at
any stage of the development that will cause scour at any point in the receiving
environment. Where there is an increase in 1 year ARI peak stormwater flows,
a Hydraulic Engineer must certify that the increase will not be responsible for
any scour in the receiving environment; and
b. the discharge of stormwater from construction or completed stages of the site
does not affect the approved design residence time of the Noosa Springs Golf
Course lake system.
64. Monetary contributions shall be paid to Noosa Council towards the cost of providing
and/or upgrading various infrastructure at the rates applicable at the time of
payment. An estimate only of the amended contribution amounts relating to this
“Change to an Existing Approval” dated 18 January 2018 under the Council policies
and requirements applied on the original approval is outlined in the table below:
PSP12 –
Public Open
Space
Contributions PSP17 – PSP20 – TOTAL
PSP16 –
Water Pathway
Contribution Sewerage Contribution
(Not applicable in Supply Trunk
Required For: accordance with Headworks Amount per
Headworks Network
Council letter Contributions Stage
dated 24 January Contributions Contributions
1996 and Council
Decision of 1
November 2007)
Stage CTS 100 $0 $51,653 $173,751 $27,538 $252,942
Stage CTS 200 $0 $17,315 $57,735 $8,919 $83,969
Stage CTS 300 $0 $32,283 $108,935 $17,211 $158,429
Stage CTS 400 $0 $8,516 $23,239 $3,599 $35,354
Resort Facilities
Stage CTS 500 $0 $39,033 $129,632 $20,002 $188,667
Stage CTS 600 $0 $17,756 $59,914 $9,466 $87,136
Stage CTS 700 $0 $18,929 $63,182 $9,779 $91,890
Stage CTS 800 $0 $17,756 $59,914 $9,466 $87,136
Stage CTS 900 $0 $14,527 $49,021 $7,745 $71,293
TOTAL
Contribution $0 $217,768 $725,323 $113,725 $1,056,816
Amount =
Please note that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from September 2017 until the date of payment.
All contributions must be paid prior to commencement of the use.
Water Supply and Sewerage contributions are payable directly to Unitywater.
Page 19 of 135
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.