GENERAL COMMITTEE MEETING AGENDA 15 JANUARY 2018
72. The development must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy 9, Waste Management, including:
a. an external imperviously paved area correctly sized for all refuse and recycling
containers and suitably screened from public places and neighbouring
properties.
b. a bin wash area with a cold-water tap, hose and drain outlet connected to
sewer, via a bucket trap. The drain outlet is to be designed to prevent storm
water entry to the sewerage system which can be achieved by a bunded area,
with a nib wall height of 100mm maximum, enclosing a wash area of 700mm x
700mm minimum (max 0.7m²). Alternatively, the waste area can be roofed, or
another appropriate design approved by Council.
81. Noise emission from mechanical equipment (air conditioners, refrigeration equipment,
or pool pumps etc) shall comply with the following requirements:
a. A person must not use equipment on any day if it makes or causes noise to be
made:
i. From 10pm to 7am: Not more than the higher of either:
a. 40 dB(A)
b. 3 dB(A) above the background noise level
No audible noise for pool pumps apply during these hours
ii. From 7am to 7pm: Not more than the lower of either:
a. 50 dB(A)
b. dB(A) above the background noise level
iii. From 7pm to 10pm:
b. Not more than 3 dB(A) above the background noise level.
83 The development shall comply with the noise management strategies contained in
the report prepared by Ron Rumble Pty Ltd and dated November 2006, with the
following additional details to be provided prior to issue of Operational Works to the
reasonable satisfaction of Manager, Environmental Health Noosa Council: -
83.1 The necessary and appropriate noise control measures incorporated into the
façade of the apartments and within the restaurant. These measures shall
include:
83.1.1 Upgraded glazing and air-conditioning to the potentially affected
apartments;
83.1.2 Strategically placed wing walls on balconies to screen the apartment
and balconies from alfresco dining areas;
83.1.3 Installation of a roof over the outdoor dining area with absorption to the
underside should be explored;
83.1.4 Revised hours of operation to no later than midnight;
83.2 Formulate and implement a Noise Management Plan to deal with noise
emissions from the premises including patron noise.
83.3 The applicant must advise prospective purchasers that a noise management
plan has been prepared to manage noise emissions related to the
development.
83.4 The Noise Management Plan referred to in Condition 83.2 shall be incorporated
in perpetuity in the By-Laws of the Body Corp for the building.
Page 20 of 135
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.