Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2018-01-15 General Committee Agenda

of 135

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


Approved Plans
2.   Development undertaken in accordance with this approval must generally comply with the
     approved plan no. 15228.1 (Rev. C), prepared by Project Urban dated 31/10/16. The
     approved plan must be amended to:
     a.    Include the area of proposed Lot 11 as “Drainage Reserve” generally in accordance
           with the submitted “Proposed Stormwater Layout V2”,
     b.    Incorporate the indented area in the front of Lots 1 & 2 within these lots;
     c.    Include dedication of Covenant areas A & B and land behind the existing dwelling
           (from the fence line) to the eastern boundary on proposed Lot 9 as conservation park;
     d.    Include a road reserve width to provide for a cul-de-sac with a circular turning area of
           sufficient size (9m minimum radius) to accommodate the single forward motion turn
           of a Waste Collection Vehicle (WCV) together with minimum 3.5m wide verge from
           the new kerb line to the property boundary adjacent to the cul-de-sac;
     e.    Where the development is to be staged, a cul-de-sac must be included at the relevant
           stage;
     f.    Maintain the road reserve width of 15m minimum to the common boundary with Lot 6
           on RP149498;
     g.    Include a footpath in the road reserve on the western side of the new road.
New Road
3.   The new road (extension of Elkhorn Drive to the adjoining property to the west (No 20
     Eagle Drive – Lot 6 RP149498) shown on the Approved Plans must be constructed in
     accordance with the conditions of this Decision Notice and dedicated as road reserve at no
     cost to Council.
4.   The road reserve for the new road through to the adjoining property to the west must be
     dedicated with the first stage of the development.
5.   The works must be undertaken in accordance with an Operational Works approval and
     must include in particular:
     a.    an “access” road in accordance with Council’s Planning Scheme Policy 5 – Engineer
           Design Standards – Roads, Drainage and Earthworks (reserve width of 15 metres
           minimum and a carriageway width of 6 metres kerb to kerb)
     b.    sealing, drainage, kerbing and channelling
     c.    construction of pedestrian footpaths as shown on the approved plans
     d.    installation of street lighting
6.   The new road must terminate in a cul-de-sac with a circular turning area of sufficient size to
     accommodate the single forward motion turn of a Waste Collection Vehicle (WCV) clear of
     private driveways on-street parking and speed control devices or if the adjoining property to
     the west (No 20 Eagle Drive - Lot 6 RP149498) has been developed or the connecting road
     dedicated. The “access” road formation must extend to and match smoothly with the
     existing formation within Lot 6 RP149498, whichever is applicable at the time of
     construction.
Stormwater Quality
7.   Prior to Council accepting water quality treatment device assets “Off Maintenance”, the
     applicant must provide Council with a Schedule of Maintenance Costs for all activities
     undertaken to maintain the bio retention basins in accordance with the most current version
     of Healthy Waterways Bio-retention Basin Maintaining Vegetated Stormwater Assets
     Guidelines. The schedule shall include records of actual costs of maintenance work
     undertaken.

                                                                                    Page 71 of 135
Log in to download the original file

2018-01-15 General Committee Agenda(PDF, 13MB).pdf · 13.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.