Skip to the record
Accept no substitutions.

Original source · versioned page text

2018-01-15 General Committee Agenda

of 135

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                  15 JANUARY 2018


Stormwater Drainage
8.    The site must be provided with a stormwater drainage system connecting to a lawful point
      of discharge. The works must be undertaken in accordance with an Operational Works
      approval.
9.    The development must be designed such that space is allocated for dedicated whole-of-
      development stormwater quality/quantity treatment infrastructure and that major and minor
      flows from the development are drained to and treated by this infrastructure. The design of
      such infrastructure should be in accordance with current best practices, guidelines and the
      Noosa Plan, including:
      a.     State Planning Policy Part E State interest policies and assessment benchmarks
             (Water Quality) and Appendix 2 – Stormwater Management Design Objectives;
      b.     Noosa Plan Planning Scheme Policy 5— Engineering Design Standards – Roads,
             Drainage and Earthworks);
      c.     Australian Rainfall and Runoff Guidelines;
      d.     Queensland Urban Drainage Manual (including Ch 4 Catchment hydrology, Ch 5
             Detention/retention systems and Ch 13 Safety aspects);
      e.     MUSIC Modelling Guidelines; and
      f.     Water Sensitive Urban Design Technical Design Guidelines for South East
             Queensland, including current versions of updated guidelines such as Bioretention
             Technical Design Guidelines
10.   If stormwater is to be discharged through an adjacent property, written consent must be
      gained from the relevant property owners prior to lodgement of an application for
      Operational Works.
Vegetation
11.   Existing native trees on the site and in the road verge must be retained in accordance with
      an Arborist Report for the development and referenced in a Development Permit for
      Operational Works. The existing native trees to be retained must be located clear of
      proposed services and generally suitable for the proposed location.
12.   Vegetation must only be removed or disturbed in accordance with a Fauna Management
      Plan (or part thereof) and endorsed through an Operational Works approval.
Dedication of Land as Reserve
13.   The land area described as Covenant A and Covenant B, including the area beyond the
      existing fence line to the eastern boundary in Lot 9 must be dedicated to Council as
      freehold land as park with the first stage of the development. The land to be dedicated is
      “non-trunk infrastructure” for the purposes of the Sustainable Planning Act 2009.
14.   A 4.5 metre wide easement for access purposes must be registered against the title of the
      property in favour of Council over the land area identified as Lot 9 on the subject site to
      provide access to the dedicated park areas.
15.   The land area to be dedicated must by unencumbered by services such as pump stations,
      services easements or similar operational uses.
Works within Protected Land
16.   The following works must be undertaken in the land required to be transferred to Council:
      a.     Timber Post and rail fencing to any newly created residential lots
      b.     Removal of any fencing between the park areas required to be dedicated and the
             esplanade


                                                                                    Page 72 of 135
Log in to download the original file

2018-01-15 General Committee Agenda(PDF, 13MB).pdf · 13.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.