GENERAL COMMITTEE MEETING AGENDA 15 JANUARY 2018
Stormwater Drainage
8. The site must be provided with a stormwater drainage system connecting to a lawful point
of discharge. The works must be undertaken in accordance with an Operational Works
approval.
9. The development must be designed such that space is allocated for dedicated whole-of-
development stormwater quality/quantity treatment infrastructure and that major and minor
flows from the development are drained to and treated by this infrastructure. The design of
such infrastructure should be in accordance with current best practices, guidelines and the
Noosa Plan, including:
a. State Planning Policy Part E State interest policies and assessment benchmarks
(Water Quality) and Appendix 2 – Stormwater Management Design Objectives;
b. Noosa Plan Planning Scheme Policy 5— Engineering Design Standards – Roads,
Drainage and Earthworks);
c. Australian Rainfall and Runoff Guidelines;
d. Queensland Urban Drainage Manual (including Ch 4 Catchment hydrology, Ch 5
Detention/retention systems and Ch 13 Safety aspects);
e. MUSIC Modelling Guidelines; and
f. Water Sensitive Urban Design Technical Design Guidelines for South East
Queensland, including current versions of updated guidelines such as Bioretention
Technical Design Guidelines
10. If stormwater is to be discharged through an adjacent property, written consent must be
gained from the relevant property owners prior to lodgement of an application for
Operational Works.
Vegetation
11. Existing native trees on the site and in the road verge must be retained in accordance with
an Arborist Report for the development and referenced in a Development Permit for
Operational Works. The existing native trees to be retained must be located clear of
proposed services and generally suitable for the proposed location.
12. Vegetation must only be removed or disturbed in accordance with a Fauna Management
Plan (or part thereof) and endorsed through an Operational Works approval.
Dedication of Land as Reserve
13. The land area described as Covenant A and Covenant B, including the area beyond the
existing fence line to the eastern boundary in Lot 9 must be dedicated to Council as
freehold land as park with the first stage of the development. The land to be dedicated is
“non-trunk infrastructure” for the purposes of the Sustainable Planning Act 2009.
14. A 4.5 metre wide easement for access purposes must be registered against the title of the
property in favour of Council over the land area identified as Lot 9 on the subject site to
provide access to the dedicated park areas.
15. The land area to be dedicated must by unencumbered by services such as pump stations,
services easements or similar operational uses.
Works within Protected Land
16. The following works must be undertaken in the land required to be transferred to Council:
a. Timber Post and rail fencing to any newly created residential lots
b. Removal of any fencing between the park areas required to be dedicated and the
esplanade
Page 72 of 135
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.