Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2018-01-15 General Committee Agenda

of 135

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018




Figure 2 – Subject and adjoining property



2.    SITE DETAILS
2.1. Background
During the application process the applicant submitted a number of preliminary stormwater
solutions for the site, some of which included significant infrastructure located within the riparian
buffer to the Noosa River; extensive filling of part of the site and a device built into the road
formation in order to drain the site predominantly to the Noosa River. To achieve a satisfactory
stormwater design, the applicant has now proposed:
    Lot 11 to be used as a detention basin to address stormwater generally flowing to the east;
      and
    Proposes to connect to the drainage reserve required for the development of the adjoining
      property to the west.
Refer Figure 3 - indicative location of stormwater solution. This will result in a reduction in
the number of lots from 11 to 10 and will require either the adjoining site to be developed and the
required drainage reserve created or alternatively the consent of the adjoining land owner to
discharge stormwater though their land. For this reason, the applicant has advised officers that
they would accept a Preliminary Approval only and amend the plans at a later date to reflect
these changes in order to receive a Development Permit.




                                                                                    Page 76 of 135
Log in to download the original file

2018-01-15 General Committee Agenda(PDF, 13MB).pdf · 13.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.