Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2018-01-15 General Committee Agenda

of 135

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                             15 JANUARY 2018




Figure 3 – indicative location of stormwater solution

2.2. Site Description
The site is located north and approximately 1 km from the Tewantin town centre on the western
bank of the Noosa River. The site has frontage to Elkhorn Drive of approximately 20 metres and
contains some mature vegetation, with some large cleared areas. The north and south eastern
corners of the site slope towards Noosa River to the east.
2.3. Surrounding Land Uses
The subject site has low density residential development to the north and south. Adjoining to the
west is a recently approved development for 22 residential lots which has been designed to
connect into the subject site.
3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of the
following statutory planning instruments to the extent they are relevant to the development:
    State Planning Policy;
    South East Queensland Regional Plan;
    The Noosa Plan.
3.2. State and Other Statutory Instruments
State Planning Policy
The State Planning Policy has been deemed by the Minister for Local Government and Planning
as appropriately reflected in the Planning Scheme and therefore does not warrant a separate
assessment.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.


                                                                                 Page 77 of 135
Log in to download the original file

2018-01-15 General Committee Agenda(PDF, 13MB).pdf · 13.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.