Original source · versioned page text
Approved Plans - RAL22/0026
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnBushfire Hazard Assessment & Management Plan v1 NCES REF: J001050 Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain 3.3 Potential Bushfire Intensity classes Table 1 details the Potential Bushfire Intensity classes and their corresponding potential fire-line intensity (KW/m) values as prescribed within Leonard et. al. 2017. Table 1: Potential Bushfire Intensity classes 3.4 Bushfire Hazard Sub-Units A sub-unit level Local Hazard Area Map has been prepared; Plan No. BF02 – Sub-Units and identifies the site scale Potential Bushfire Intensity classes across the site. The sub-unit level Local Hazard Area Map identifies that Medium Potential Bushfire Intensity Areas associated with the VHC 24.1 are located offsite to the northwest, south, and west. NOTE: SUB UNIT 2 represents VHC 3.1 – Notophyll vine forest which in its remnant form (mature fuel loads assumed) is classified as Prone Type 3 – Low hazard under Section 7.5.2 & Figure 14 of Bushfire Resilient Communities 2019. Therefore, SUB UNIT 2 was not included within this assessment. 3.5 Overall Local Hazard Map An overall Local Hazard Map has been prepared; Plan No. BF03 – Local Hazard Map and identifies the Potential Bushfire Intensity classes across the site as well as associated 100m wide Potential Impact Buffer areas. A Medium Potential Bushfire Intensity area has been identified offsite to the northwest, south, and west with western portion of the site captured in the Potential Impact Buffer. The Local Hazard Map presented in Plan No. BF03 is to supersede the SPP broadscale mapping attributed to the site and should be used to guide the formulation of appropriate site-based bushfire management measures for the proposal. © 2022 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.