Appendix D - Noosa Plan 2020 Assessment

of 47

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 Performance Outcomes                   Acceptable Outcomes                             Response

                                                  and fitted with a standard
                                                  fire brigade fitting
                                                  connected to the water
                                                  supply (other than where
                                                  the water supply is in a
                                                  swimming pool or dam).

                                        Editor’s Note — Water supply capacity for
                                        firefighting purposes is in addition to water
                                        supply capacity for household use.

 Flood Hazard                           AO16.1                                          AO16.1 Complies
 PO16
                                        Where the development is located                The site is located within the
 Development is designed and            in the Flood Hazard Area as                     Flood Hazard Area. A Flood
 sited to ensure risk to people         shown on Flood Hazard Overlay                   Information Certificate has been
 and property from flooding is          Map in Schedule 2, the finished                 sourced which advises that the
 avoided or minimised.                  floor level of habitable rooms is at            finished floor level of habitable
                                        least 300 millimetres above the                 rooms is to be 2.7m AHD.
                                        Defined flood event (DFE).
                                                                                        The proposal has been
                                        OR                                              designed to achieve the DFL as
                                                                                        prescribed for the site.

                                        AO16.2                                          Not Applicable

                                        Where the DFE has not been                      The DFE has been modelled for
                                        modelled for the area, the finished             the site.
                                        floor level of habitable rooms is at
                                        least 500 millimetres above the
                                        highest recorded flood.

                                        Editor's Note—The QDC mandatory
                                        provisions MP3.5 also apply to the
                                        construction of buildings in flood hazard
                                        areas.

 PO17                                   AO17                                            PO17 Complies
 Underground car parking areas
                                        No acceptable outcome provided                  The proposed development
 are designed to drain and
                                                                                        comprises a basement car
 function safely during a flood
                                                                                        parking level. The basement as
 event and power failure.
                                                                                        been designed the ensure
                                                                                        appropriate drainage and flood
 Editor's note—Basements should have                                                    mitigation measures.
 flood immunity above the 1%AEP
 defined flood event with alternative
 means to mechanical pumping used to
 achieve such immunity.




Low Density Housing Code                                                                                                    7
Log in to download the original file

Appendix D - Noosa Plan 2020 Assessment.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.