Appendix D - Noosa Plan 2020 Assessment
Plans and drawings: the text below has words only, no drawings.
Performance Outcomes Acceptable Outcomes Response
Major Electricity Infrastructure Not Applicable
& Substations
The site is not located within
PO18
proximity to the prescribed
AO18.1
Development is sufficiently electricity infrastructure.
separated from major electricity Development including any
infrastructure and substations to sensitive land uses is at least:
minimise the likelihood of
a) 50 metres from a
nuisance or complaint.
transmission substation;
b) 10 metres from any other
substation; and
c) 30 metres from a
transmission line
easement.
AO18.2
Habitable buildings are not located
within an easement for a
distribution line.
PO19 AO19.1
Development is located and Noise emissions do not exceed
designed to avoid or minimise 5db(A) above background noise
noise nuisance from the use of level internal to a habitable
infrastructure. building measured in accordance
with AS1055.
PO20 AO20
Wherever practicable habitable Where adjoining substations or
buildings are orientated to avoid major electricity infrastructure,
direct overlooking of major habitable buildings are orientated
electricity infrastructure or so that the majority of outdoor
substations. living areas and windows of
habitable rooms face away from
the infrastructure.
Earthworks and Drainage AO21 Not Applicable
PO21
Filling other than accessways: The proposed development
Earthworks and drainage does not involve filling works.
a) does not extend more than
operational works do not
the equivalent of 3 metres
directly, indirectly or
around the main building,
cumulatively cause adverse
measured from the outer
impacts external to the
walls of the building;
development site by:
Low Density Housing Code 8
See the original